Laserfiche WebLink
19. O< Piping (cross•secrional diagram, including connections to tank and dispensers). <br /> (A) Vent and tank riser primary containment system equipped with overfill prevention system that: <br /> Restricts delivery of flow to tank (Section 2635 (b) (2) (B) or (C)3, or <br /> Provide positive shut off of flow to the tank at no more than 95 X (Section 2635 (b)(2)(03, or <br /> (B) & Vapor recovery piping designed so it cannot contain liquid phase product, or <br /> (C) Suction piping (below grade piping operates at less than atmospheric pressure) (Section 2636 (a) (3)) <br /> Sloped so contents of the pipe will drain back into the storage tank if the suction is <br /> - released. <br /> No valves or pumps installed below grade. <br /> Inspection method provided to demonstrate compliance with section 2636 (a) (3). <br /> (D) Corrodible underground piping protected against corrosion (Section 2636 (b)). <br /> (E) DC Underground primary piping will meet all of the following requirements <br /> Primary piping.in contact with hazardous substance under normal operation conditions shall be: <br /> Installed inside a secondary containment system in the form of:_e(_seconda _ry pipeVault or <br /> _lined trench to be sloped to a collection sump at the low point of the piping. ' <br /> aPrimary piping and secondary containment systems will be installed in accordance with industry <br /> code of practice and voluntary consensus standards.. <br /> �A Lined trench used as secondary containment <br /> Material compatible with the substance stored. <br /> Covered and capable of supporting any expected vehicular traffic. <br /> (F) Underground piping with secondary containment wilt be equipped and monitored as follows: <br /> O—S Secondary containment vitt be equipped with a continuous monitoring system connected to an audible <br /> and visual alarm system. <br /> 0� Automatic line leak detectors will be installed on pressurized piping <br /> Manufacturer: ✓ pple_u Fifa. Ln• Mode I: i-D 20410 <br /> a <br /> Annual monitoring will be conducted on the pressurized piping with secondary containment. <br /> Annual line tightness test will not be required If the continuous monitor shuts down the pump and <br /> activates the alarm system when a release is detected and when the continuous monitoring system <br /> fails or is disconnected. <br /> 20. State Water Resources Control Board -'Facility (A)" and "Tank Permit (B)" application forms submitted. <br /> 21. a Plan review and operating permit fees paid. <br /> 22. _oL What is the approximate depth to ground water: ZS <br /> (include source of information . borehole logs, monitoring well data, water <br /> studies, e[c.) <br /> Flood (pwfrel Wap <br /> 23. _kL Total nunber of tanks on site after installation: 2 <br /> 24. County/Cfty Fire District and Building Department notified. <br /> 25. _C In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br /> responsibility (in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br /> Requirements) as an owner or operator to submit a workplan to PNS-END Site Mitigation Unit prior to initiating any <br /> assessment or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br /> The owner o(• operator must acknowledge this responsibility for workplan submittal by.signature and date below. <br /> �Nsm/e7�y / eF RHa Title 46t {. �kCO Kkt �o. Date. �-7 <br /> COND I T I OXS�OF APPROVAL: P <br /> 8 <br />