Laserfiche WebLink
D <br /> A <br /> A <br /> K <br /> E. <br /> 1, CLEAN-Lj) <br /> 41 <br /> 1, GENLI <br /> THE GROU'NOING S�I`STEM $HALL BE flSTALLED IN ACCORD�NCE WITH THE THE CONTRACTOR 'SHALL CLEAN-UP THL JOB SITE PRIOR TO THE 76 MWIS CC~ <br /> 0) LATEST EDITION OF THE NATIONAL FLECTRIC COOF, ALL MOTORS, REPRESENTATIVE ACCEPTANCE OF THE WORK, DIRT EXCESSES AND DEBR6 SHALL BE <br /> STARTING EQUIPMENT, AND CONDUIT S`TSTEMS �IHAU. PE GROIUNDFD� THE REMOVED 10 REVEAL. A CLEAN SHE APPEARANCE, ANY DAMAGE DONE BY THE CONTRACIOR 10 <br /> b) P�I`E UNDER PRESSURE CAN FAJL CATASTRCPHICALLY �F ALL FITTINGS ARE NOT WAIER SUPPLY LINES AND STEEL BUIILDING SHALL BE MADE PART OF TFIE ANY PART OF THE SITE SHALL BE CORRECTED AT HIS EXPENSE, <br /> SECURED, VAKE SURE ALI. (3LUED FtTTINGS AND IOINf� ARE CLJRED� GROUNDING ELECTRODE, THE GROUNDING ELECITRODE CONDUCTOR STIALL BE <br /> SIZE[) ACCORD!tC TO THE NATIONAL E[ECTRIC CODE (1990), PUT SHALL b) ALL TANK SUMPS AND DISPENSER BOXES SHALL BE LFFT (.lE-,AJN, DRY, AND FRFF OF <br /> ANY CONSTRUCT�ON DEBRIS. <br /> BE NO SMALLER THAN # 6 XWO, COPPER <br /> 0 <br /> SCHEDULE ALL INSPFC[IONS WITH A MINUMUM OF 24 HOURS, �,n <br /> 1 BF REMOKED BY THE <br /> FAWr C*~XCAWTAM WABBM <br /> PERCEPTIBLE WATER IN IANKS AND CONTAINMENT AREAS SHAt <br /> CONTRACTOF?� <br /> MONITOR 9STEM START-UP TO BE DONE BY 16 AYW"W CIO~ OW FM FU <br /> T[.JROI <br /> 2� AR0 <br /> MKffjV4#a CMTRAM START-4A) TO BE SCHEDULED �j DTSTROUTOR, A <br /> MINIMUM OF 48 HOURS IN ADVANCE, <br /> 2, -`Iff al M THE FO[LOWING DOCUMENTAflON FS TO BE' SUBMITTED TO THE X AM"n a <br /> �L,AN,Q-TUL E00 b) THE VEEDFR-ROOT SYSTEM TO BE CONFIGURED PER THE PROTOCOL SHOWN ON ICRA04, J- REPRESENTATIVE UPON COMPLETION Of' THE PR0,Jf"Cfl <br /> CONfRACTOR TO PROVIDE TANK TFSl' MANIFOLD PER MANUFACTURER'S INSTALLATION 05 <br /> iNSTRUCTIONS AND lHESE SPECIFICANONS, a) XERXES T&NK INSTALLARON CHECKLISI` <br /> b) CONTRACFOR TO FURNISH AIR PRESSURE GAUGE WITH A UkX�MUM FULL SCALE READING b) VAPORLES'S, MANI)F ACT URING, WARRANTY REGISTRAnotq <br /> i I PS)r RE GAUGE 1, PUMP I ',"JAL!AlIP <br /> INCREMENTS FOR PRIMA[ZY PIPING FEST, USE A PRESSU <br /> OF' IRIS PSIG WID ALL PERMIT DRAWING6 <br /> WITH A MAMMUM FULL SCALE READING OF 15 PSIG WITH 1/4 OR 1/10 PSIG iNCREmEINTS' <br /> FOR SECONDARY PIPING IEST, PRESSURE GAUGE TO BE IN GOOD REPAIR, AND HAVE A �NSTALL DISPENSER DOXES IRUE AND LEVIFL, USE MANI�FAC,TLIPER <br /> 'ED OR OUT OF COMPLETEO PERMil CARDS <br /> PROVIDED 11VIELING LUGS, CONTRA(.,,TOR 10 ENSURE THAT ALL <br /> ALLDRATiON DAIE 'WITHIN 30 DAYS OF USE, PRESS3URE GAUGES DAIMAG FACTORY d) <br /> CAT iBRATION WILL NOT BF PERMITTED PROVIDED VALVES ANP FITriNGS ALIGN WITH DISPENSER Flfl`ING""� <br /> NOTIFY 76 P%V(�M C4�~ REPRESENTATIVE OF' ANY M6ALIGNMENT, AS--B(JiLT DRA*NGS <br /> 3OX <br /> 3, JESTING _QF-PR!MARY,-PEE REWORKING OF DISPENSERS OR DISPFNSf'R F ES IS TO BE DONE BY <br /> AUTHORIZED SFR'vlCE REPRESENTATIVE ONLY, <br /> CAP ALL SFIE.AR VALVE�3, AND FLEX01 CONNECTORS AT IHE TANK <br /> J, <br /> 2, <br /> b) C0NNE(`,F THE IESf MANIFOLD fO AN [EST PORT ON A SHEAR VALVE ENSURE TliAT 22fKEK--A!,--Q8A-QE <br /> AIL REMA�NiNG, FIFTINGS ARE PROPERLY t)OPED, �`)LUG(,ED AND l-l(4flENE(), �N J1.)RISGICTIONS WHERE IS REQUIRED BY HANDICAP CODE, AND PERMITTLD BY THE <br /> LOCAL AGENC�ES, THE 06PENSER�,,,*; SHALL BE BOXES SHALL BE INSTALLED WITHOUT <br /> p T rv- <br /> IT 3 1� <br /> 71- -TRITOi T75c, n �S[ANISS, <br /> CONNECTORS TANK CHECK FOR AFlIVE BUB'BLES tFiDICATINC A LEAK, <br /> 'PENSER 13OXES AIRE 10 BE INSIALLED IRUL ANE) LEVf"i, <br /> b) THE QIX <br /> PRESSURI7E THIF PiPE TO <br /> R ACTNI-BMJI:q`� 7 'E SLOPED AS TO PREVENT WAIE�',R FROM FLOW1% <br /> Fll"PNGS, AND LES NDICAT�NIG A -AK,Z IHE SURROUNDING CQN(,','RElE IS TO B <br /> r 15 <br /> 71-777,F)TT-FOR (5 F 30 MINUET& M-MTT�R-Tf7 <br /> CHANCA,-,,� INTO CONTAINMENT BOXES <br /> 3, T-S'T�N(; OF DISPENSER BOXES <br /> REDOCE PRESSURE TO 25 P%, AND MONITOR [*[,Y TO CHECK FOR AN'T DAMAGE <br /> DURING CONSTRUCTION� UPON COMPLENON OF THE PIPING, AND ELECTRICAL INSTALLATION, ALL <br /> DISPENSER BOXLS 'SHALL BE WATER IESTED FOR TK`,HTNESS. WAlER iS TO <br /> TOP OF' PiE CONTAINMENT BOXES, VISUALLY IN <br /> 4, 1 1 <br /> BF ALI,ED To sf ECI <br /> BOX FOR LEAKS AND MONIrOR OR 24 HOURS, IF THERE 6 NO LOS" OF <br /> IRIMARY PIPE CAP ANE) PLUG ALL OPEN FH'TINGS ON WATER, THE BOX SHALL BE CONSIDEREEI [IGHT, REMOVE ALL WATER WITH <br /> VAINTAIN PRESSURE ON THE <br /> THF ',,,EC0NRARY OPiN(, CONTRACTOR PROVIDED SIPHON PUMP <br /> b) CONNECT TEST MAN(FOLD 1-0 SECONDARY fESf FllfiNG �Nl TANK SUMP H- <br /> PRESSURIZE THE SECONDARY PIPE� TO 5 SOAP PIE LIN� FiTlINC6 ANO Rk�GEMENT DRAWING, CONTRACrOP SHALL, LEVEL AND <br /> 1 AS SPECJFIED ()N GENERAL AP <br /> A LEAK. LEAVIE AT TEST ANCHOR EACH DISPENSER ro CONCRETE ISLAND PER DRAWNG J - 2 OR J - 2D, <br /> CONNECTORS TANK CHECK FOR ACTIVE BUBBLE.`) INDICATING <br /> .-,R�00 OF 30 PIINLIETS MONITOR F"OPI ANY PRESSURE CHANGES, <br /> F'R[SSURE FOR A FIF <br /> 2, PADLOCK Ail DISPENSER NOZZLES AND AftOW D6PENSER SHIPP�NG' CARTON OR <br /> �E AND VONTIOR UhLY TO (,HECK FOR ANY r,)AVA(,,E ()Ulll'�NG CRAFING, TO REMAIN OVER DISPENSER FOR PROTECTION AFTER iNSTALLAIION, <br /> ,J) MAINTAIN PRE5SUr <br /> CONSIRUCTION. <br /> L <br /> Ml"',"�,-MA El--ElEiIQ-R-JQ-B-, �'�KBU <br /> I DISPENSEP WERS SHAU., HE ADJUSIED AS NEAR, AS POSSIBLE LO 1[14,0 ERI`�,OR, <br /> A <br /> �E INSPECTED PRiOR TO BA(,,KRLL BY A <br /> ALL UNDERGROUND PIPING SYSTEMS SHALL B <br /> 76 /Woa= 6U~ RFPRE5ENTAflVF, 2, ADVISE, 76 AqOMM W~REPRE$ENTANVE OF' ANY MEIER IHAT CANNol BE' HE LD <br /> ')LERAN(,'E IN A 5 GALLON MEASURF <br /> TO PLUS-OR-MiNUS 3 CLIK INCHES OF Tf, FOR REPA9 <br /> b) REPRESENTANVE VERIFY 114" FIER PII-j:A14-, FALL Wt[H (-l'0NlRA(,,,,r0R UNDER VAAWACTURER'S WARRANIY, <br /> SOPIPLIED 4 FOOT BI-ft[)ER'S LEVEL <br /> 'r THODS PRE'SCRIGEL) BY DEPARIMENT OF WEIGHT") <br /> 3: TESF WIL RE MADE ACCC'ftING TO ME <br /> c) ALI- PRODUCT PIPING WILL BE VtSUALLY INSPECTED FOR, ANY PRODUCT M&-MATCHES <br /> AND MENSURES, <br /> ()IR PRODUCT (;ROSSES, <br /> J. <br /> d) NSPECTION B'i 76 ARUM a~ REPRESENTATIVE DOES NOF RELIEVE <br /> CONTRAC,'TOR OF' RESPONSIBILITY FOR, PIROPER INSTALLAILON, I ')1, 1 1 <br /> THE CONTRACTOR SRALIL RrQUES,r THE 7$ AqWr$ CV~ REPRESENTAlIVE To <br /> F. jWtMUL0MAfffiJ" <br /> ARRANGE F013 DELIVERY OF PEIROLEUM PRODUCTS 48 HOURS BEFORE PRODUCI IS RFOU�iRED <br /> I ('0ND'UIT-RUN" FOR TESTING EOUIPMENT, <br /> ALL EXPO'51,1) (1f)NDLATS SHALL BE INSTALLED SIRAIGA-il AND TROE WITH REFERENCE TO b) IMNVENAIELY AFTER THE DEtIVERY, CONTRACTOR AND 76 MWIS ON~ <br /> c -H A <br /> THE AD,fA(',',FTIT NORK, WHEN A NUMBFR OF ADJACENT CONOUITS RUN IN THE SAME REPRESEMTK�IVF SHALL TOG�IHER ACCURATELY (3AUGF THE f,`FfR0LEtJm PROf,)U T Wil <br /> GAFUGE STICK AND RECORD THE DE'UVEREI) OIJANTITY OF PRCOUCT, <br /> DIRECITION, tHEY SHALL RUN PARALLEL, <br /> b) ALL CC)NDUIP3 SLIALL BE A MlNiMUM OF 24' RELOW GRADE, AND BACKFILL. wmi A UP'ON COMPLETION AND ACCEPTANCE OF CONSTRUCF10N 'WORK BY THE 76 PAMM CV~ <br /> MINiMUM OF 12' OF CLEAN WASHED SANO CONDLflTS iN THE TANK FX(,�AVATION AND PIPING ROPRESENTATIVE, THE C0,61TRA fOR SHALL REPEAT 1-HE GAUGIN(l; PROCEDURE AND <br /> TRENCHES SIIALL BE',' BACKFILLED THE SAME MATERIAL USED FO'R THE TANK AND PIPING RECORD FOR COMPAR60N WITH THE FIRI;T CAUGES. <br /> [-,3ACKFiLL <br /> 2, 1,1�t!A '51 <br /> Q -�LQ- <br /> ALL CONDUITS RUNS SHALL BE INSTALL AVOiD PIPfl(,, CONDUITS SHALL <br /> ED 50 AS TO o) THIE TANK AND PIPRIC; SY,STEMS MUST PASI,*-, A FVLL S�SIEM PREC6�,ON FE3T PURSUANT <br /> BF INSTALLED SO THAT THERE SHALL NO BE LESS fl-iAN 12" CILEARANCE TO PIPING EXCEPT <br /> HHE CONSTRUCTION WILL PERMIT, WHFRE TG) SECTIQN 2643, SUB SECFION (b) OF THE CALIFORNIA CODE ()F RE,(A)LATIONS, TTTLE <br /> Ar CP0SSIN(3 WHE,RE SPACE WILL BE ACI CREAT A'-' 3 <br /> 'ATH THE PIPING, 22 , PRIOR TO FINAL APPROVAL <br /> CONDUITS CROSS PIPING, THE CONDUIT IS TO BE �NSIALLED UNDERNE <br /> d) CONDUIT SYSTEMS AND ALL CONDT)CTINIG ffiff ENcL,0l)URf:,s SLIOULD BE SECURELY b) �NSTALLING CONTRACTOR TO COORDINATE SCHEDULING WITH 7$ kYjWWjS CO~ TANK <br /> I E STING C CDNI RAC TOR, 7S Aq%k= Ca~ M 4%Wl AW PAY fW Aw MM <br /> BONDED To (lTHER, <br /> c) TAtNK TESTING' CONTRA(lOR 'SHALL PROVO[ ALL TEST RF'SULTS TO 76 MUM 4U~ <br /> 2, <br /> ,A L T Q) Ahl) LOCAL AGENCY INSPECTORS AS REQUiRED. <br /> iN EACH CONDIJIT RUN ENIERiNG AN ENCLOSURE f(I)IR `,)WIT(AIES, PANFI. (3()ARDS, <br /> WIREWAYS, CIRCUIT BREAKERS, OR OTHER APPARATUS THAT MAY PRODUCE SPARKS, ARCS, OP d) CQN�RACTQR TO BE PRESENT DUR�ING TESI`5 -10 AS95T TE.5TER, <br /> HIC,H TEMPERATURES, SEAL 5 "'&iALL BE �NSrALLED 18 FROM SUCH ENCLOSL)RES, 6 <br /> �E'Sf FLUID FOR PRODUCI" fANK PS BE IHE DESIGNATED FIRODUCI I;QR lHE IS,PEC II'ICI <br /> b) THE SEAL FlITING SHALL BE [HE FIRST CONDUFT FlfflNG AFIER THE CoNiCull TA N pll, <br /> FMER�ES FROM 11-iF EARTH OR CONCRETE, f) �F AN ONDERGROUND WASTE Ok TANK 6 rO BE INSTALLED, THE" TFsT FlUID IS TO <br /> K INAIER, CQNIRA(�`TOR I0 FILL IANK TO TOP OF FI�L TUBE IN PREPARAflON FOR <br /> METAL CONDULIS, CONTAINING NO UNIONS, COUPLINGS, BOXES OR FITTINGS, THAT <br /> PASS 600i.ETFLY THROUGH A HAZARD01 IS t,C)CATION, WITH NO HTmqcs ass mAN u�' <br /> BEYOND [A(',H BOUNDARY SHALL NOf BE RFOUIP <br /> - �[() TO BE" SEALED IF THE TER, INATION il-'10N St)(�C,ESSF1.)L COMPLETION OF TANK TE'Sr, FHE CONTRACTOR SHALL PUMP Ot,)T ALL <br /> P0NTS OF' THF UNBROKEN CONDUITS ARE' IN UNCLASSIFIFE) LOCATIONS, WATER FROM THC WASTE O�L TANK AND LEGALLY DISPOSE OF ff, <br /> 3� WIRES AND CABL <br /> 1 VAPOR 8 L Q 'E,­IEST <br /> o') RAC,bV,40'S SHALL BE,.' COMPLETE AND PERMANENTLY IN PLACE BEFORE JNSTALLANON OF' <br /> VAPOR BLOCKAGE TEST ON THE VAPOR RECOVERY P�PING IS REQUIRED WIFH A, <br /> CONDUCTORS, FR <br /> IN 30 DAYS (OR AS REQUIRED BY LOCAt A)R QUALLTY, AGENCY) AF r <br /> OPENING SITE, FORW&RD ALL TEST RESULTS TO TliE APPROPRIATE <br /> "IORS SHALL BE* CLEAN WHEN INSTALLED. ALL CONDUCTOR$ SHALL BE. lVE, <br /> b CONDLIC <br /> "ES ARE' M )E, AGENCY(S) AND 78 PAW= 0%~ REPRF$ENTAl <br /> CONTINUOUS AND WITHOUT SPUCE'S BETWEEN k)NCTION BOXES, WHERE SPLIC A[ <br /> THE INSU0,flON COLOR OF EACH ELECTRICAI- CIRCL)IT SHALL BE CONTINUOUS THROUGH ITS, 4 <br /> 4, jjLA <br /> x <br /> LENGTH <br /> INSTALLING CONTRACTOR TO PERFORM LEAK DETECTOR FUNCHON TEST PER Al" <br /> W�RING DIACRAM FOR TYPICAL WRJN(,-, (TO USED AS GUIDELINE ONLY) SEE DRAW�W, <br /> MANVACTURES INSIRUCTIONS. TFST TO BE WITNESSED BY /6 AM" Ct~ F <br /> REPRESENTATIVE, <br /> DE$TPOY ALL KNIS REY, cxo, APP'D ,E <br /> REVISED OfN04 fAkitR OATf BY BY BY APPROVAL RCCORD APPROVALS <br /> REV DATE NAWN B'Y TAIT <br /> MILESTONE OATE WPROVAL <br /> UNION 01L OF C"ALAFORW, dba UNOCAL, 1994 <br /> UNDERGROUND FUEL, TANKS <br /> ISSUED FOR C,U,P, <br /> fHIS DOCUMENT' AND THE NFORMAWN CONNNED HEREAN il--'� CHICKED Er� WD <br /> AND TESTING <br /> PROPRIETARY TO IMON OIL OF CAUFORNIA (UNOCAQ '�ND HAS <br /> 'CK 4� <br /> ISSIAD FOR PLAN CHF, <br /> :'rC'ONTINUED FkM J-002) <br /> GENERAL., ECIFICATIONS , PIPING, <br /> BEEN FURM�3110) IN CONFOENCE AND ARE SUB,JECT 'TO, THE <br /> APPRCW0 <br /> TERMS OF A SEPARATE SECRECY AGREEMEN'r BETWEEN' UNOCAL ' <br /> ISSUED FOR GEN, 00 5/1117 pe�,A -777 <br /> DkOlNq,NO, <br /> AND THE IRECIPIEW, THE RECIPIENT 6 NOT TO COPY, DUPLICATE (aQSKSS UWt WANA(0) 6A'T <br /> DATE 1-27-97 EF <br /> FY) "ONSTRUCT, <br /> 0-2A <br /> OR DISCLOSE THE CONTENTS 10 ANY PERSON OR ENTITY EX��PT ISSUEO �R G <br /> AS EXPRESSLY AUTHORVED BY SAID AGREEMEV OR BY UNOCAL <br /> Vlkki� NONC <br /> RKPON UKMEEP) <br /> N WRITING. RLCORI) DRAW�0� ..... (�Ml <br />