D
<br /> A
<br /> A
<br /> K
<br /> E.
<br /> 1, CLEAN-Lj)
<br /> 41
<br /> 1, GENLI
<br /> THE GROU'NOING S�I`STEM $HALL BE flSTALLED IN ACCORD�NCE WITH THE THE CONTRACTOR 'SHALL CLEAN-UP THL JOB SITE PRIOR TO THE 76 MWIS CC~
<br /> 0) LATEST EDITION OF THE NATIONAL FLECTRIC COOF, ALL MOTORS, REPRESENTATIVE ACCEPTANCE OF THE WORK, DIRT EXCESSES AND DEBR6 SHALL BE
<br /> STARTING EQUIPMENT, AND CONDUIT S`TSTEMS �IHAU. PE GROIUNDFD� THE REMOVED 10 REVEAL. A CLEAN SHE APPEARANCE, ANY DAMAGE DONE BY THE CONTRACIOR 10
<br /> b) P�I`E UNDER PRESSURE CAN FAJL CATASTRCPHICALLY �F ALL FITTINGS ARE NOT WAIER SUPPLY LINES AND STEEL BUIILDING SHALL BE MADE PART OF TFIE ANY PART OF THE SITE SHALL BE CORRECTED AT HIS EXPENSE,
<br /> SECURED, VAKE SURE ALI. (3LUED FtTTINGS AND IOINf� ARE CLJRED� GROUNDING ELECTRODE, THE GROUNDING ELECITRODE CONDUCTOR STIALL BE
<br /> SIZE[) ACCORD!tC TO THE NATIONAL E[ECTRIC CODE (1990), PUT SHALL b) ALL TANK SUMPS AND DISPENSER BOXES SHALL BE LFFT (.lE-,AJN, DRY, AND FRFF OF
<br /> ANY CONSTRUCT�ON DEBRIS.
<br /> BE NO SMALLER THAN # 6 XWO, COPPER
<br /> 0
<br /> SCHEDULE ALL INSPFC[IONS WITH A MINUMUM OF 24 HOURS, �,n
<br /> 1 BF REMOKED BY THE
<br /> FAWr C*~XCAWTAM WABBM
<br /> PERCEPTIBLE WATER IN IANKS AND CONTAINMENT AREAS SHAt
<br /> CONTRACTOF?�
<br /> MONITOR 9STEM START-UP TO BE DONE BY 16 AYW"W CIO~ OW FM FU
<br /> T[.JROI
<br /> 2� AR0
<br /> MKffjV4#a CMTRAM START-4A) TO BE SCHEDULED �j DTSTROUTOR, A
<br /> MINIMUM OF 48 HOURS IN ADVANCE,
<br /> 2, -`Iff al M THE FO[LOWING DOCUMENTAflON FS TO BE' SUBMITTED TO THE X AM"n a
<br /> �L,AN,Q-TUL E00 b) THE VEEDFR-ROOT SYSTEM TO BE CONFIGURED PER THE PROTOCOL SHOWN ON ICRA04, J- REPRESENTATIVE UPON COMPLETION Of' THE PR0,Jf"Cfl
<br /> CONfRACTOR TO PROVIDE TANK TFSl' MANIFOLD PER MANUFACTURER'S INSTALLATION 05
<br /> iNSTRUCTIONS AND lHESE SPECIFICANONS, a) XERXES T&NK INSTALLARON CHECKLISI`
<br /> b) CONTRACFOR TO FURNISH AIR PRESSURE GAUGE WITH A UkX�MUM FULL SCALE READING b) VAPORLES'S, MANI)F ACT URING, WARRANTY REGISTRAnotq
<br /> i I PS)r RE GAUGE 1, PUMP I ',"JAL!AlIP
<br /> INCREMENTS FOR PRIMA[ZY PIPING FEST, USE A PRESSU
<br /> OF' IRIS PSIG WID ALL PERMIT DRAWING6
<br /> WITH A MAMMUM FULL SCALE READING OF 15 PSIG WITH 1/4 OR 1/10 PSIG iNCREmEINTS'
<br /> FOR SECONDARY PIPING IEST, PRESSURE GAUGE TO BE IN GOOD REPAIR, AND HAVE A �NSTALL DISPENSER DOXES IRUE AND LEVIFL, USE MANI�FAC,TLIPER
<br /> 'ED OR OUT OF COMPLETEO PERMil CARDS
<br /> PROVIDED 11VIELING LUGS, CONTRA(.,,TOR 10 ENSURE THAT ALL
<br /> ALLDRATiON DAIE 'WITHIN 30 DAYS OF USE, PRESS3URE GAUGES DAIMAG FACTORY d)
<br /> CAT iBRATION WILL NOT BF PERMITTED PROVIDED VALVES ANP FITriNGS ALIGN WITH DISPENSER Flfl`ING""�
<br /> NOTIFY 76 P%V(�M C4�~ REPRESENTATIVE OF' ANY M6ALIGNMENT, AS--B(JiLT DRA*NGS
<br /> 3OX
<br /> 3, JESTING _QF-PR!MARY,-PEE REWORKING OF DISPENSERS OR DISPFNSf'R F ES IS TO BE DONE BY
<br /> AUTHORIZED SFR'vlCE REPRESENTATIVE ONLY,
<br /> CAP ALL SFIE.AR VALVE�3, AND FLEX01 CONNECTORS AT IHE TANK
<br /> J,
<br /> 2,
<br /> b) C0NNE(`,F THE IESf MANIFOLD fO AN [EST PORT ON A SHEAR VALVE ENSURE TliAT 22fKEK--A!,--Q8A-QE
<br /> AIL REMA�NiNG, FIFTINGS ARE PROPERLY t)OPED, �`)LUG(,ED AND l-l(4flENE(), �N J1.)RISGICTIONS WHERE IS REQUIRED BY HANDICAP CODE, AND PERMITTLD BY THE
<br /> LOCAL AGENC�ES, THE 06PENSER�,,,*; SHALL BE BOXES SHALL BE INSTALLED WITHOUT
<br /> p T rv-
<br /> IT 3 1�
<br /> 71- -TRITOi T75c, n �S[ANISS,
<br /> CONNECTORS TANK CHECK FOR AFlIVE BUB'BLES tFiDICATINC A LEAK,
<br /> 'PENSER 13OXES AIRE 10 BE INSIALLED IRUL ANE) LEVf"i,
<br /> b) THE QIX
<br /> PRESSURI7E THIF PiPE TO
<br /> R ACTNI-BMJI:q`� 7 'E SLOPED AS TO PREVENT WAIE�',R FROM FLOW1%
<br /> Fll"PNGS, AND LES NDICAT�NIG A -AK,Z IHE SURROUNDING CQN(,','RElE IS TO B
<br /> r 15
<br /> 71-777,F)TT-FOR (5 F 30 MINUET& M-MTT�R-Tf7
<br /> CHANCA,-,,� INTO CONTAINMENT BOXES
<br /> 3, T-S'T�N(; OF DISPENSER BOXES
<br /> REDOCE PRESSURE TO 25 P%, AND MONITOR [*[,Y TO CHECK FOR AN'T DAMAGE
<br /> DURING CONSTRUCTION� UPON COMPLENON OF THE PIPING, AND ELECTRICAL INSTALLATION, ALL
<br /> DISPENSER BOXLS 'SHALL BE WATER IESTED FOR TK`,HTNESS. WAlER iS TO
<br /> TOP OF' PiE CONTAINMENT BOXES, VISUALLY IN
<br /> 4, 1 1
<br /> BF ALI,ED To sf ECI
<br /> BOX FOR LEAKS AND MONIrOR OR 24 HOURS, IF THERE 6 NO LOS" OF
<br /> IRIMARY PIPE CAP ANE) PLUG ALL OPEN FH'TINGS ON WATER, THE BOX SHALL BE CONSIDEREEI [IGHT, REMOVE ALL WATER WITH
<br /> VAINTAIN PRESSURE ON THE
<br /> THF ',,,EC0NRARY OPiN(, CONTRACTOR PROVIDED SIPHON PUMP
<br /> b) CONNECT TEST MAN(FOLD 1-0 SECONDARY fESf FllfiNG �Nl TANK SUMP H-
<br /> PRESSURIZE THE SECONDARY PIPE� TO 5 SOAP PIE LIN� FiTlINC6 ANO Rk�GEMENT DRAWING, CONTRACrOP SHALL, LEVEL AND
<br /> 1 AS SPECJFIED ()N GENERAL AP
<br /> A LEAK. LEAVIE AT TEST ANCHOR EACH DISPENSER ro CONCRETE ISLAND PER DRAWNG J - 2 OR J - 2D,
<br /> CONNECTORS TANK CHECK FOR ACTIVE BUBBLE.`) INDICATING
<br /> .-,R�00 OF 30 PIINLIETS MONITOR F"OPI ANY PRESSURE CHANGES,
<br /> F'R[SSURE FOR A FIF
<br /> 2, PADLOCK Ail DISPENSER NOZZLES AND AftOW D6PENSER SHIPP�NG' CARTON OR
<br /> �E AND VONTIOR UhLY TO (,HECK FOR ANY r,)AVA(,,E ()Ulll'�NG CRAFING, TO REMAIN OVER DISPENSER FOR PROTECTION AFTER iNSTALLAIION,
<br /> ,J) MAINTAIN PRE5SUr
<br /> CONSIRUCTION.
<br /> L
<br /> Ml"',"�,-MA El--ElEiIQ-R-JQ-B-, �'�KBU
<br /> I DISPENSEP WERS SHAU., HE ADJUSIED AS NEAR, AS POSSIBLE LO 1[14,0 ERI`�,OR,
<br /> A
<br /> �E INSPECTED PRiOR TO BA(,,KRLL BY A
<br /> ALL UNDERGROUND PIPING SYSTEMS SHALL B
<br /> 76 /Woa= 6U~ RFPRE5ENTAflVF, 2, ADVISE, 76 AqOMM W~REPRE$ENTANVE OF' ANY MEIER IHAT CANNol BE' HE LD
<br /> ')LERAN(,'E IN A 5 GALLON MEASURF
<br /> TO PLUS-OR-MiNUS 3 CLIK INCHES OF Tf, FOR REPA9
<br /> b) REPRESENTANVE VERIFY 114" FIER PII-j:A14-, FALL Wt[H (-l'0NlRA(,,,,r0R UNDER VAAWACTURER'S WARRANIY,
<br /> SOPIPLIED 4 FOOT BI-ft[)ER'S LEVEL
<br /> 'r THODS PRE'SCRIGEL) BY DEPARIMENT OF WEIGHT")
<br /> 3: TESF WIL RE MADE ACCC'ftING TO ME
<br /> c) ALI- PRODUCT PIPING WILL BE VtSUALLY INSPECTED FOR, ANY PRODUCT M&-MATCHES
<br /> AND MENSURES,
<br /> ()IR PRODUCT (;ROSSES,
<br /> J.
<br /> d) NSPECTION B'i 76 ARUM a~ REPRESENTATIVE DOES NOF RELIEVE
<br /> CONTRAC,'TOR OF' RESPONSIBILITY FOR, PIROPER INSTALLAILON, I ')1, 1 1
<br /> THE CONTRACTOR SRALIL RrQUES,r THE 7$ AqWr$ CV~ REPRESENTAlIVE To
<br /> F. jWtMUL0MAfffiJ"
<br /> ARRANGE F013 DELIVERY OF PEIROLEUM PRODUCTS 48 HOURS BEFORE PRODUCI IS RFOU�iRED
<br /> I ('0ND'UIT-RUN" FOR TESTING EOUIPMENT,
<br /> ALL EXPO'51,1) (1f)NDLATS SHALL BE INSTALLED SIRAIGA-il AND TROE WITH REFERENCE TO b) IMNVENAIELY AFTER THE DEtIVERY, CONTRACTOR AND 76 MWIS ON~
<br /> c -H A
<br /> THE AD,fA(',',FTIT NORK, WHEN A NUMBFR OF ADJACENT CONOUITS RUN IN THE SAME REPRESEMTK�IVF SHALL TOG�IHER ACCURATELY (3AUGF THE f,`FfR0LEtJm PROf,)U T Wil
<br /> GAFUGE STICK AND RECORD THE DE'UVEREI) OIJANTITY OF PRCOUCT,
<br /> DIRECITION, tHEY SHALL RUN PARALLEL,
<br /> b) ALL CC)NDUIP3 SLIALL BE A MlNiMUM OF 24' RELOW GRADE, AND BACKFILL. wmi A UP'ON COMPLETION AND ACCEPTANCE OF CONSTRUCF10N 'WORK BY THE 76 PAMM CV~
<br /> MINiMUM OF 12' OF CLEAN WASHED SANO CONDLflTS iN THE TANK FX(,�AVATION AND PIPING ROPRESENTATIVE, THE C0,61TRA fOR SHALL REPEAT 1-HE GAUGIN(l; PROCEDURE AND
<br /> TRENCHES SIIALL BE',' BACKFILLED THE SAME MATERIAL USED FO'R THE TANK AND PIPING RECORD FOR COMPAR60N WITH THE FIRI;T CAUGES.
<br /> [-,3ACKFiLL
<br /> 2, 1,1�t!A '51
<br /> Q -�LQ-
<br /> ALL CONDUITS RUNS SHALL BE INSTALL AVOiD PIPfl(,, CONDUITS SHALL
<br /> ED 50 AS TO o) THIE TANK AND PIPRIC; SY,STEMS MUST PASI,*-, A FVLL S�SIEM PREC6�,ON FE3T PURSUANT
<br /> BF INSTALLED SO THAT THERE SHALL NO BE LESS fl-iAN 12" CILEARANCE TO PIPING EXCEPT
<br /> HHE CONSTRUCTION WILL PERMIT, WHFRE TG) SECTIQN 2643, SUB SECFION (b) OF THE CALIFORNIA CODE ()F RE,(A)LATIONS, TTTLE
<br /> Ar CP0SSIN(3 WHE,RE SPACE WILL BE ACI CREAT A'-' 3
<br /> 'ATH THE PIPING, 22 , PRIOR TO FINAL APPROVAL
<br /> CONDUITS CROSS PIPING, THE CONDUIT IS TO BE �NSIALLED UNDERNE
<br /> d) CONDUIT SYSTEMS AND ALL CONDT)CTINIG ffiff ENcL,0l)URf:,s SLIOULD BE SECURELY b) �NSTALLING CONTRACTOR TO COORDINATE SCHEDULING WITH 7$ kYjWWjS CO~ TANK
<br /> I E STING C CDNI RAC TOR, 7S Aq%k= Ca~ M 4%Wl AW PAY fW Aw MM
<br /> BONDED To (lTHER,
<br /> c) TAtNK TESTING' CONTRA(lOR 'SHALL PROVO[ ALL TEST RF'SULTS TO 76 MUM 4U~
<br /> 2,
<br /> ,A L T Q) Ahl) LOCAL AGENCY INSPECTORS AS REQUiRED.
<br /> iN EACH CONDIJIT RUN ENIERiNG AN ENCLOSURE f(I)IR `,)WIT(AIES, PANFI. (3()ARDS,
<br /> WIREWAYS, CIRCUIT BREAKERS, OR OTHER APPARATUS THAT MAY PRODUCE SPARKS, ARCS, OP d) CQN�RACTQR TO BE PRESENT DUR�ING TESI`5 -10 AS95T TE.5TER,
<br /> HIC,H TEMPERATURES, SEAL 5 "'&iALL BE �NSrALLED 18 FROM SUCH ENCLOSL)RES, 6
<br /> �E'Sf FLUID FOR PRODUCI" fANK PS BE IHE DESIGNATED FIRODUCI I;QR lHE IS,PEC II'ICI
<br /> b) THE SEAL FlITING SHALL BE [HE FIRST CONDUFT FlfflNG AFIER THE CoNiCull TA N pll,
<br /> FMER�ES FROM 11-iF EARTH OR CONCRETE, f) �F AN ONDERGROUND WASTE Ok TANK 6 rO BE INSTALLED, THE" TFsT FlUID IS TO
<br /> K INAIER, CQNIRA(�`TOR I0 FILL IANK TO TOP OF FI�L TUBE IN PREPARAflON FOR
<br /> METAL CONDULIS, CONTAINING NO UNIONS, COUPLINGS, BOXES OR FITTINGS, THAT
<br /> PASS 600i.ETFLY THROUGH A HAZARD01 IS t,C)CATION, WITH NO HTmqcs ass mAN u�'
<br /> BEYOND [A(',H BOUNDARY SHALL NOf BE RFOUIP
<br /> - �[() TO BE" SEALED IF THE TER, INATION il-'10N St)(�C,ESSF1.)L COMPLETION OF TANK TE'Sr, FHE CONTRACTOR SHALL PUMP Ot,)T ALL
<br /> P0NTS OF' THF UNBROKEN CONDUITS ARE' IN UNCLASSIFIFE) LOCATIONS, WATER FROM THC WASTE O�L TANK AND LEGALLY DISPOSE OF ff,
<br /> 3� WIRES AND CABL
<br /> 1 VAPOR 8 L Q 'E,IEST
<br /> o') RAC,bV,40'S SHALL BE,.' COMPLETE AND PERMANENTLY IN PLACE BEFORE JNSTALLANON OF'
<br /> VAPOR BLOCKAGE TEST ON THE VAPOR RECOVERY P�PING IS REQUIRED WIFH A,
<br /> CONDUCTORS, FR
<br /> IN 30 DAYS (OR AS REQUIRED BY LOCAt A)R QUALLTY, AGENCY) AF r
<br /> OPENING SITE, FORW&RD ALL TEST RESULTS TO TliE APPROPRIATE
<br /> "IORS SHALL BE* CLEAN WHEN INSTALLED. ALL CONDUCTOR$ SHALL BE. lVE,
<br /> b CONDLIC
<br /> "ES ARE' M )E, AGENCY(S) AND 78 PAW= 0%~ REPRF$ENTAl
<br /> CONTINUOUS AND WITHOUT SPUCE'S BETWEEN k)NCTION BOXES, WHERE SPLIC A[
<br /> THE INSU0,flON COLOR OF EACH ELECTRICAI- CIRCL)IT SHALL BE CONTINUOUS THROUGH ITS, 4
<br /> 4, jjLA
<br /> x
<br /> LENGTH
<br /> INSTALLING CONTRACTOR TO PERFORM LEAK DETECTOR FUNCHON TEST PER Al"
<br /> W�RING DIACRAM FOR TYPICAL WRJN(,-, (TO USED AS GUIDELINE ONLY) SEE DRAW�W,
<br /> MANVACTURES INSIRUCTIONS. TFST TO BE WITNESSED BY /6 AM" Ct~ F
<br /> REPRESENTATIVE,
<br /> DE$TPOY ALL KNIS REY, cxo, APP'D ,E
<br /> REVISED OfN04 fAkitR OATf BY BY BY APPROVAL RCCORD APPROVALS
<br /> REV DATE NAWN B'Y TAIT
<br /> MILESTONE OATE WPROVAL
<br /> UNION 01L OF C"ALAFORW, dba UNOCAL, 1994
<br /> UNDERGROUND FUEL, TANKS
<br /> ISSUED FOR C,U,P,
<br /> fHIS DOCUMENT' AND THE NFORMAWN CONNNED HEREAN il--'� CHICKED Er� WD
<br /> AND TESTING
<br /> PROPRIETARY TO IMON OIL OF CAUFORNIA (UNOCAQ '�ND HAS
<br /> 'CK 4�
<br /> ISSIAD FOR PLAN CHF,
<br /> :'rC'ONTINUED FkM J-002)
<br /> GENERAL., ECIFICATIONS , PIPING,
<br /> BEEN FURM�3110) IN CONFOENCE AND ARE SUB,JECT 'TO, THE
<br /> APPRCW0
<br /> TERMS OF A SEPARATE SECRECY AGREEMEN'r BETWEEN' UNOCAL '
<br /> ISSUED FOR GEN, 00 5/1117 pe�,A -777
<br /> DkOlNq,NO,
<br /> AND THE IRECIPIEW, THE RECIPIENT 6 NOT TO COPY, DUPLICATE (aQSKSS UWt WANA(0) 6A'T
<br /> DATE 1-27-97 EF
<br /> FY) "ONSTRUCT,
<br /> 0-2A
<br /> OR DISCLOSE THE CONTENTS 10 ANY PERSON OR ENTITY EX��PT ISSUEO �R G
<br /> AS EXPRESSLY AUTHORVED BY SAID AGREEMEV OR BY UNOCAL
<br /> Vlkki� NONC
<br /> RKPON UKMEEP)
<br /> N WRITING. RLCORI) DRAW�0� ..... (�Ml
<br />
|