My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CARPENTER
>
3480
>
2300 - Underground Storage Tank Program
>
PR0231533
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2021 11:50:59 PM
Creation date
11/2/2018 4:13:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231533
PE
2381
FACILITY_ID
FA0003745
FACILITY_NAME
ROTO ROOTER
STREET_NUMBER
3480
Direction
E
STREET_NAME
CARPENTER
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
17916040
CURRENT_STATUS
02
SITE_LOCATION
3480 E CARPENTER RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CARPENTER\3480\PR0231533\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
2/28/2012 8:00:00 AM
QuestysRecordID
133869
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRITTEN MOv"TTORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating permit. The permit holder must notify San Joaquin County <br /> Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before making the change. <br /> Required by Sections 2632(d) and 2641(h) CCR <br /> Facility Name Roto-Rooter <br /> Facility Address zaan Carpenter Rd Stockton , CA 95215 <br /> A. Describe the frequency of performing the monitoring: <br /> Tank na ; ly- <br /> Piping <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring: <br /> Tank Stick <br /> Piping <br /> C. Describe the location(s) where the monitoring wt11 be performed (facility plot plan <br /> should be attached): <br /> Diesel Gas <br /> D. list the names) and titles) of the people responsible for performing the monitoring <br /> and/or maintaining the equipment: <br /> Steve Perotti & Justin Simko <br /> E. Reporting format for monitoring: <br /> Tank Chart <br /> Piping <br /> F. Describe the preventive maintenance schedule for the monitoring equipment_ Note: <br /> Maintenance must be in accordance with the manuf cturers' maintenance schedule <br /> butnotless than every 12 months: Check for leakage <br /> G. Describe the training necessary for the operation of UST system, including piping, <br /> and the monitoring equipment: Class held every 6 months on <br /> stick & Emergency switch. <br />
The URL can be used to link to this page
Your browser does not support the video tag.