My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
139
>
2300 - Underground Storage Tank Program
>
PR0231039
>
REMOVAL_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:53 AM
Creation date
11/2/2018 4:18:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2003
RECORD_ID
PR0231039
PE
2361
FACILITY_ID
FA0006437
FACILITY_NAME
CHEVRON STATION #90557*** (INACT)
STREET_NUMBER
139
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730012
CURRENT_STATUS
02
SITE_LOCATION
139 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CENTER\139\PR0231039\REMOVAL 2003.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC HEALTH SERVICES 4� <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DIVISION � < <br /> Karen Furst, M.D., M.P.H., Health Officer <br /> 304 East Weber Avenue,Third Floor a Stockton,CA 95202 gar <br /> 209/468-3420 <br /> APPLICATION FOR PEILNIIT TO CLOSE <br /> UNDERGROUND STORAGE TANKS STORING HAZARDOUS MATERIALS <br /> I. GENERAL INSTRUCTIONS: <br /> [] 1. Submit all information in triplicate. Answer all questions,leaving no blanks. One copy will be returned to <br /> the applicant with comments. <br /> [� 2. Include a detailed site map on a separate sheet of paper,showing the location of the tanks(s),piping,streets, <br /> adjacent properties (north toward the top of the page), nearby septic ranks, leachfields, water wells, <br /> buildings, underground public utility lines(including water, sanitary sewer and storm sewer), and distance <br /> of piping from tank to dispensers. If underground utilities are not included on the site map,you must state <br /> in writing that USA Dig will be contacted prior to excavation activities. <br /> [} 3. Complete page 3, "Application for Underground Storage Tank Closure Permit". of : Sampling firm <br /> shall be an independent third party from the contactor. <br /> [] . 4. Complete page 9, "Authorization to Release". This form must be signed and dated by the <br /> OWNER/OPERATOR of the facility. <br /> 5. Submit the appropriate fees and complete page 11, the "Underground Storage Tank Program Fee <br /> Worksheet". <br /> [� 6. Complete all questions on page 10,the Public Health Services-Environmental Health Division(PHS-EHD) <br /> "Underground Storage Tank Disposition Tracking Record",except those requiring a signature and date <br /> of tank removal. The holder of the permit shall be responsible for ensuring that this form is completed and <br /> returned to PHS-EHD within 30 days of the tank removal. <br /> ['r 7. Submit a "Site Health&Safety Plan" as an addendum to this application,to address all potential hazards <br /> for this specific job site. Refer to the Site Safety Plan Guidance Document for specifics. <br /> [� 8. If facility is located outside of the city limits,submit a 'Backfill Excavation Certificate" as required by <br /> the County.of San Joaquin Building Department and the incorporated City Building Departments,pursuant <br /> to the Uniform Building Code STD 70-11. <br /> 9. Obtain a "Grading and Excavation Permit" from the City of Tracy Building Division prior to PHS-EHD <br /> approval of the closure plan. <br /> [}0 10. The maximum review time for Closure Plans is 15 working days from receipt of the adequately completed <br /> plan. If gross deficiencies are identified, an addendum will be required with a 389.00/hour fee and the <br /> review will begin on the date of resubmittal. <br /> [] 11. Submit verification of the fire pemtit from the appropriate fire district at the removal inspection. <br /> [] 12. Advance inspection notice of at least 48 hours is required by PHS-EHD <br /> [] 13. Submit Contingency Plan for over-excavation at time of UST removal(if planning to over-excavate). <br /> See"III. SITE MITIGATION"on Page 2. <br /> EH 23046 (Revised 8/1/01) Pagel <br /> A Division of San Joaquin County Health Care Smices <br />
The URL can be used to link to this page
Your browser does not support the video tag.