Laserfiche WebLink
fj%tD SCry <br /> J� J DR. MARY GONZALES MEND <br /> STOCKTON UNIFIED SCHOOL DISTRICT SUPERINTENDENT <br /> BOARD OF EDUCATION <br /> y FACILITIES SERVICES <br /> 1932 NORTH EL PINAL DRIVE • STOCKTON, CA 95205-2551 OSE H.LEE MEYER <br /> 1851 ( FRANK E.OROZCO <br /> 209) 944-4083 <br /> WILLIAM L.PONDER <br /> HILARY ROGE.4S <br /> ANN STALLWORTH <br /> XM 0 2rJ JAMESL.DREAM <br /> 71 <br /> November 27 , 1989 trQy 2 <br /> qJ <br /> �1i} <br /> N✓IR :?I'Fiv?H,I_ <br /> Public Health Services <br /> San Joaquin County <br /> Attn: Doug Wilson, R.S. <br /> 1601 East Hazelton Ave. <br /> Stockton, Ca. 95201 <br /> Subject : Underground Storage Tanks at Edison High School , <br /> Franklin High School , Stagg High School , The S .U .S .D . <br /> Corporation Yard and Woodruff Occupational Center <br /> Dear Mr . Wilson: <br /> The Stockton Unified School District wishes to clarify its <br /> intentions regarding its underground storage tanks and the <br /> provisions discussed during administrative hearings on July 24 , <br /> 1989 , between Public Health Services and the District . <br /> Stockton Unified School District intends to accomplish the <br /> following: <br /> o Remove all underground tanks at the above mentioned sites <br /> with the exception of the leaded and unleaded gasoline <br /> tanks in its Corporation Yard. A detailed list of tanks to <br /> be removed is attached. <br /> o Replace the 500 gallon gasoline tanks at the three high <br /> schools, the 40w motor oil tank and the waste oil tank in <br /> the Corporation Yard with new aboveground tanks. The <br /> installation of new aboveground tanks will require the <br /> District to engage the services of an electrical engineer <br /> and have plans approved by the State Fire Marshal ' s office. <br /> This requirement is already in progress. The District has <br /> also corresponded with the local fire department regarding <br /> the temporary abandonment of our underground tanks to allow <br /> this project to be coordinated in a cost-effective and <br /> timely manner. A letter from the local fire marshal is <br /> forthcoming. <br /> o The removal of underground tanks and the replacement of <br /> aboveground tanks will be incorporated into one project and <br /> a contract awarded in early Spring, 1990 . Estimated target <br /> date for project completion is June 30 , 1990 . <br />