My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
205
>
2300 - Underground Storage Tank Program
>
PR0231042
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2024 12:40:42 PM
Creation date
11/2/2018 4:19:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231042
PE
2381
FACILITY_ID
FA0003613
FACILITY_NAME
ARCO STATION #4493*
STREET_NUMBER
205
Direction
N
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13909003
CURRENT_STATUS
02
SITE_LOCATION
205 N CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CENTER\205\PR0231042\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
3/2/2012 8:00:00 AM
QuestysRecordID
119110
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 . RESPONSE PLAN <br /> OPERATOR RESPONSIBILITIES <br /> A. LEAK RECORDING AND REPORTING PROCEDURE <br /> Whenever an alarm is activated, station personnel are to immediately: <br /> a Contact ARCO Maintenance or its designated agent by using the telephone number <br /> previously provided. <br /> b. If any visible indications of petroleum products or vapors are noticed call 911. <br /> C. Make an entry in the Recordable Discharge Log (Form APPC-765-1: attached) <br /> indicating the action taken. <br /> d. Complete the Recordable Discharge Log when and as the source of the alarm is <br /> known. <br /> ARCO RESPONSIBILITIES <br /> B. METHOD OF REMOVING AN UNAUTHORIZED RELEASE FROM THE SECONDARY <br /> CONTAINMENT <br /> a. Any unauthorized release into the secondary containment system of a product <br /> tank will be removed by pumping. Uncontaminated product may be returned to <br /> the tank. Contaminated product may be returned to the refinery to be recycled <br /> or may be disposed of following procedures in accordance with California Health <br /> and Safety Code requirements. In the event of an emergency, a pumping <br /> contractor or truck will be available immediately. In all other cases, <br /> equipment availability will be within 12 hours. <br /> b. ARCO Maintenance will be responsible for authorizing and selecting <br /> contractors for the work to be performed. <br /> 5 . TRAINING <br /> In addition to the training covering subjects mentioned in Sections 3 and 4 above, training <br /> needed for the operation of the tank system and monitoring equipment includes: <br /> How to: <br /> - Take tank level measurements <br /> - Read dispenser meters <br /> - Inspect equipment <br /> - Recognize warning signs: dispenser hesitations, meter spins and odors <br /> - Manually close dispenser impact valve <br /> - Replace dispenser filters <br /> - Shut down the system with and location of: ARCOmatic switch, electrical panel <br /> breakers, and emergency shut off switch <br /> - Test the electronic monitor <br />
The URL can be used to link to this page
Your browser does not support the video tag.