Laserfiche WebLink
y <br /> 8. a. D the method that wlU be willzed to purge and/or Inert the tanks l(�� <br /> h. Tank/Piping Hauler. <br /> Name �/ G G <br /> Address Z��-45 LI /1 /1 () City(�ap 91/b <br /> Phone No{' Fv <br /> Hauler Registration N(if hauled as hazardous) /S� <br /> C. Tank0ping Disposal Site: <br /> Name � r;L � <br /> AddressCft9ILj^l� �pG7�_ <br /> Phone No{ <br /> EPA IDN(if transported to a permitted TSD facility) <br /> 9. Is the sampling firm an Independent third party from the Contractor? YES'M NO(j <br /> 9a. De be,in detail.how the soil aydlor water same s)h each a tank and piping will be obtained <br /> L "r <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal• <br /> aiaun �� <br /> 11. Handling of excavated soil: <br /> a)What material will he used to Hue the tank pit and cover the stockpile? <br /> 1/I-S Z&&221 l c <br /> b)Whatwill be the final destination of the excavated stoc"Ue? <br /> c)Contaminated Soil Hazardous Waste Hauler. <br /> Name /UnierRegistration# �q� <br /> Address S S 0 U� cuy ✓nY�tlX ap-1M[_ <br /> Phone NO.( <br /> EH M 046(Revised 10119198) Page 5 <br />