My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_APR 1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
205
>
2300 - Underground Storage Tank Program
>
PR0231042
>
REMOVAL_APR 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:54 AM
Creation date
11/2/2018 4:21:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
APR 1999
RECORD_ID
PR0231042
PE
2381
FACILITY_ID
FA0003613
FACILITY_NAME
ARCO STATION #4493*
STREET_NUMBER
205
Direction
N
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13909003
CURRENT_STATUS
02
SITE_LOCATION
205 N CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CENTER\205\PR0231042\REMOVAL 4_1999.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE WORK HEALTH AND SAFETY PLAN <br /> 1. GENERAL <br /> This Health and Safety Plan has been designed to conform to and/or exceed guidance standards <br /> promulgated by EPA and the California Department of Health Services, Federal OSHA regulations <br /> (29CFR1910.120) and CAL/OSHA regulations. Because considerable experienced judgment must <br /> be applied to decisions that will be made while actually working on site, it is the goal of this plan to <br /> provide maximum work efficiency while maintaining an uncompromisingly safe working environment. <br /> This plan is not a substitute for experienced judgment and direction,or for common sense during <br /> construction activities. <br /> Henderson Construction will provide services and equipment for the completion of the scope <br /> of work. Henderson Construction(as well as all subcontractors and independent contractors)will <br /> adhere to the Site Work Health and Safety Plan. <br /> 2. WORK OBJECTIVE <br /> The overall work objective is to provide for proper and safe completion of scope of work. <br /> 3. SAFETY MANAGMENT <br /> The field supervisor, 'tet, �' L�L�. �, ��I ,is the site and safety officer and will <br /> ensure that all personnel comply with all applicable regulations and requirements of this plan. Due <br /> to the various aspects of the work, specific personnel are not assigned to this project at present. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.