Laserfiche WebLink
( 4@ x 30 CLR <br />(2 I),TYPIgAL <br />13 <br />I I i <br />AR <br />5% SLOPE FOR 10" <br />DISPENSERS, TYPICAL <br />251-11, <br />FUELING ISLAND LAYOUT <br />SCALE: 1/4" . V-0" <br />GILBARCO ENCORE 6ELECT BLENDER, 40 5'0" WIDE <br />TS &x&x3/16" W/ WELDED STEEL <br />TOP. FILL W/ CONC. 4 PAINT <br />WHITE (.'WH -835 - CONFIRM) <br />ELASTCJMERIC SEALANT <br />D15PENOER BASE <br />CONC. PAVEMENT <br />PROVIDE SLIP 8HEET BETWEEN <br />P05T FOOTING 4 CONC. SLAB <br />!304 FELT OR 61MILAR) <br />18"0 CONCRETE FOOTING <br />FUEL ISLAND BOLLARD <br />SCALE: 1/2" - V 0" <br />FACE OF <br />STRUCTURE <br />1/4" RADIUS <br />TOOL EDGE -� <br />a <br />— ELASTOMERIC SEALANT <br />-- 3/8" PRE -MOLDED <br />EXPANSION MATERIAL <br />(FULL DEPTH OF CONIC. <br />SECTION) <br />ISOLATION / EXPANSION JOINT <br />NOT TO SCALE <br />DISPENSER ------ <br />FILTER ---- — <br />1 1/2"0 SCH, 40 BLACK IRON <br />PIPE RISER ----- <br />12" N.P.T. INLET UNION ---- <br />(B1DISPENSER MFG.) <br />FILTER CHANGE TRIP TRAY -- <br />(BY DISPENSER MFG.) <br />DPW DUAL POPPET IMPACT VALVE <br />(SHEAR SECTION TO BE FLUSH <br />WITH TOP OF DISPENSER ISLAND) <br />3/4" P.V.C. PUMP OUT PIPE <br />WITH THREADED FITTING --- <br />F.R.P. <br />—F.R.P. DISPENSER CONTAINMENT SYSTEM <br />45' BLACK IRON ELBOW — — <br />G <br />° <br />4 <br />� <br />ul <br />� <br />1 <br />11- <br />' <br />f <br />e <br />° <br />-1 ,----2 1/2" MINIMUM CLEARANCE <br />BETWEEN FITTING & PIPE <br />2"0 F.R.P. PIPE <br />O3'0 F.R:P, PIPE <br />SUMP PENETRATION BOOT - <br />MINIMUM <br />CLEARANCE 3" TO 2" REDUCER BOOT <br />BETWEEN WITH TEST PORT ------ - 1 <br />PIPE (ROLL BACK BOOT AFTER TESTING) <br />DISPENSER --------- - -------- <br />GENERAL CONTRACTOR TO PROVIDE <br />RIGID PIPING TO EACH VAPOR RECOVERY <br />MANIFOLD ----'--- //J <br />1 1/2" x 1' DPW DUAL POPPET f-- <br />72 <br />45' BLACK IRON ELBOW <br />6" MINIMUM PEA GRAVEL -. <br />COVER OVER F.R.P. PIPE <br />2"0 F.R.P. VAPOR RECOVERY PIPE - <br />SUMP PENETRATION BOOT ----- <br />v -EXPLOSION PROOF JUNCTION BOX <br />SEAL OFF <br />-PIPE CAP WITH HOLE FOR <br />V CONTAINMENT PROBE WIRE <br />�- -SEAL ALL OPENINGS WATER TIGHT <br />SLOPE CONCRETE <br />5% FOR 10" <br />AT FACE OF <br />DISPENSER (TYR) <br />4 � m �. <br />1 e c <br />D <br />-- STABILIZER BAR <br />----BRACKET EXTENSION <br />--- SUMP PENETRATION BOOT <br />FOR CONDUIT <br />-- 1' CONDUIT TO CONTROL <br />PANEL (POWER) <br />--I" CONDUIT TO CONTROL <br />PANEL (DATA) <br />---3/4" CONDUIT TO CONTROL <br />PANEL (SPEAKER) <br />1 -3/4" CONDUIT FOR CONTAINMENT <br />i BOX PROBE TO MONITOR PANEL <br />--BRACKET <br />(DO NOT PENETRATE SUMP) <br />7-}fS: ��j�� -- 3" P.V.C. PIPE OPEN AT BOTTOM. <br />\ ATTACH TO CONTAINMENT I30X <br />AS NEEDED FOR SUPPORT. <br />-- DISCRIMINATING SENSOR <br />_.._.___.—. ---_-1 1/2"M SNIVEL x 2"F x 24" <br />FLEXIBLE CONNECTOR, ALTERNATE <br />FLEXIBLE CONNECTOR WITH ELBOW <br />USE NON -HARDENING <br />JOINT COMPOUND <br />FOR THREADED CONNECTIONS. <br />--2" BELL & MALE F.R.P. <br />THREADED ADAPTOR <br />NOTE: MOUNT VAPOR SHUTOFF VALVE USING <br />VAPOR IMPACT VALVE SUPPORT KIT. <br />M/%rbon FA9rc(OWERV <br />n DISPENSER PAN AND PIPING DETAILS <br />SCALE: ON <br />NOTES <br />1. SUPREME NOZZLE MUST ALWAYS BE ON THE LEFT, <br />2. PRODUCT PIPING (HARD) MUST ALWAYS PENETRATE THE DISPENSER SUMP FROM TIE OPPOSITE SIDE OF THE <br />CONDUIT. <br />3. PLUG ON VAPOR SHEAR VALVE MUST BE ACCESSIBLE. <br />4. USE RIGID PIPE (INSTEAD OF HOSE) FOR VAPOR INSIDE ALL DISPENSERS. <br />5. INSTALL VAPOR SHEAR SUPPORT FROM TOP OF SHEAR VALVE TO DISPENSER. <br />6. PULL BACK REDUCERS IN DISPENSER BOXES AFTER SECONDARY PIPE HAS BEEN TESTED, <br />TESTING <br />1, FILL DISPENSER SUMP WITH WATER UP TO HIGHEST PENETRATION. <br />REMOVE WATER WHEN DIRECTED BY OWNER'S REPRESENATIVE. <br />2. WHEN TESTING PRODUCT LINES, INSTALL STEEL CAP ON OPEN <br />SHEAR VALVES TO AVOID DAMAGE TO THE VALVE. <br />- --1 1/2'M SWIVEL x 2"FX 24" <br />FLEXIBLE CONNECTOR <br />UUSEEAPPROVED NON -HARDENING <br />JOINT COMPOUND FOR THREADED <br />CONNECTIONS. <br />-2" BELL & MALE F.R.P. <br />THREADED ADAPTOR <br />w � " <br />WUW'QU�IL-Au <br />F 11 <br />WZ�i@� H- <br />g�° N q� <br />N <br />'n3 !DQ <br />_Q)0 <br />E <br />111 <br />4 <br />� <br />ul <br />� <br />1 <br />11- <br />' <br />f <br />e <br />° <br />Q <br />p <br />m <br />O <br />lu <br />UL <br />0 <br />(L <br />a <br />a <br />4 <br />M/%rbon FA9rc(OWERV <br />n DISPENSER PAN AND PIPING DETAILS <br />SCALE: ON <br />NOTES <br />1. SUPREME NOZZLE MUST ALWAYS BE ON THE LEFT, <br />2. PRODUCT PIPING (HARD) MUST ALWAYS PENETRATE THE DISPENSER SUMP FROM TIE OPPOSITE SIDE OF THE <br />CONDUIT. <br />3. PLUG ON VAPOR SHEAR VALVE MUST BE ACCESSIBLE. <br />4. USE RIGID PIPE (INSTEAD OF HOSE) FOR VAPOR INSIDE ALL DISPENSERS. <br />5. INSTALL VAPOR SHEAR SUPPORT FROM TOP OF SHEAR VALVE TO DISPENSER. <br />6. PULL BACK REDUCERS IN DISPENSER BOXES AFTER SECONDARY PIPE HAS BEEN TESTED, <br />TESTING <br />1, FILL DISPENSER SUMP WITH WATER UP TO HIGHEST PENETRATION. <br />REMOVE WATER WHEN DIRECTED BY OWNER'S REPRESENATIVE. <br />2. WHEN TESTING PRODUCT LINES, INSTALL STEEL CAP ON OPEN <br />SHEAR VALVES TO AVOID DAMAGE TO THE VALVE. <br />- --1 1/2'M SWIVEL x 2"FX 24" <br />FLEXIBLE CONNECTOR <br />UUSEEAPPROVED NON -HARDENING <br />JOINT COMPOUND FOR THREADED <br />CONNECTIONS. <br />-2" BELL & MALE F.R.P. <br />THREADED ADAPTOR <br />w � " <br />WUW'QU�IL-Au <br />F 11 <br />WZ�i@� H- <br />g�° N q� <br />N <br />'n3 !DQ <br />_Q)0 <br />E <br />111 <br />� l- <br />��H,r <br />F - <br />Z � Z 'j) z <br />OQ uOTOX <br />U' <br />Y 3 ::3 <br />UW aL0v <br />VVVV Q <br />uUl <br />N <br />ll+ Q <br />N <br />} <br />� <br />ul <br />� <br />1 <br />11- <br />' <br />f <br />Q <br />p <br />m <br />O <br />lu <br />UL <br />0 <br />(L <br />� l- <br />��H,r <br />F - <br />Z � Z 'j) z <br />OQ uOTOX <br />U' <br />Y 3 ::3 <br />UW aL0v <br />VVVV Q <br />uUl <br />N <br />ll+ Q <br />N <br />} <br />IU <br />H- <br />a <br />a <br />PET -6 <br />OE 5 8PEErs <br />