My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2300 - Underground Storage Tank Program
>
PR0503963
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2024 1:14:08 PM
Creation date
11/2/2018 4:24:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0503963
PE
2381
FACILITY_ID
FA0009476
FACILITY_NAME
PG&E: Stockton Gas Plant
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
St
City
Stockton
Zip
95203
APN
137-320-02, 04
CURRENT_STATUS
02
SITE_LOCATION
535 S Center St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CENTER\535\PR0503963\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
3/1/2012 8:00:00 AM
QuestysRecordID
120369
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD <br /> FORM `B': UNDERGROUND STORAGE TANK PROGRAM <br /> TANK TANK PERMIT APPLICATION INFORMATION m <br /> COMPLETE A SEPARATE FORM WITH THE FOLLOWING INFORMATION FOR EACH TANK. - <br /> MARK ONLY ❑ 1 NEW PERMIT ❑3 RENEWALPERMIT ❑5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED TANK <br /> ONE ITEM ❑2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑6 TEMPORARY TANK CLOSURE P�8 TANK REMOVED <br /> FACILITY/SITE NAME WHERE TANK IS INSTALLED: 535Cr° FARM TANK-YES❑ NO ® O <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-IF UNKNOWN—SO SPECIFY P <br /> A. OWNERS TANK ID p e. MANUFACTURED BY; <br /> C. YEAR INSTALLED D. TANK CAPACITY IN GALLONS: <br /> II. TANK CONTENTS IF(AL1),IS MARKED,COMPLETE ITEM C.IF(AL1),IS NOT MARKED,COMPLETE ITEM D. <br /> A. ❑ 1 MOTOR VEHICLE FUEL ❑ 2 PETROLEUM B. C. E] 1 UNLEADED ❑2 LEADED ❑3 DIESEL <br /> ❑3 CHEMICAL PRODUCT ❑4 OIL ❑ 1 PRODUCT ❑4 GASAHOL ❑ 5 JET FUEL ❑6 AVIATION GAS <br /> ❑5 HAZARDOUS 80 EMPTY ❑95 UNKNOWN ❑ 2 WASTE ❑ 7 METHANOL ❑99 OTHER(DESCRIBE IN ITEM D,BELOW) <br /> D. IF NOT MOTOR VEHICLE FUEL,ENTER NAME OF <br /> HAZARDOUS SUBSTANCE STORED&C.A.S.# C.A.S.W <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOX A,B,C,AD <br /> A.TYPE OF ❑ I DOUBLE WALLED ❑3 SINGLE WALLED WITH EXTERIOR UNER ❑95 UNKNOWN <br /> SYSTEM ❑2 SINGLE WALLED ❑4 SECONDARY CONTAINMENT ❑99 OTHER <br /> ❑ 1 STEEUIRON ❑2 STAINLESS STEEL ❑ 3 RBERGLASS ❑4 STEEL CUD W/FIBERGLASS REINFORCED PLASTIC <br /> B.TANK ❑5 CONCRETE ❑6 POLYVINYLCHLORIDE ❑7 ALUMINUM ❑8100%METHANOL COMPATIBLE FRP <br /> MATERIAL <br /> ❑9 BRONZE ❑ 10 GALVANIZED STEEL ❑95 UNKNOWN ❑99 OTHER <br /> C. INTERIOR F-11 RUBBER LINED ❑2 ALKYD LINING 3 EPDXY UNING E]4 PHENOLIC LINING <br /> LINING ❑5 CUBS LINING ❑6 UNLINED ❑95 UNKNOWN <br /> ❑IS LINING MATERIAL COMPATIBLE NTH 100%MI ❑YES ❑NO ❑99 OTHER <br /> D.CORROSION ❑ 1 POLYETHLENE WRAP ❑2 TARORASPHALT ❑3 VINYL WRAP ❑4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑91 NONE ❑95 UNKNOWN ❑99 OTHER <br /> IV. PIPING INFORMATION CIRCLE A IF ABOVE GROUND, U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 91 NONE A U 95 UNKNOWN A U 99 OTHER <br /> B.CONSTRUCTION A U 1 SINGLE WALLED A U 2 DOUBLE WALLED A U 3 LINED TRENCH A U 91 NONE A U 95 UNKNOWN A U 99 OTHER <br /> A U i STEEL/IRON A U 2 STAINLESSSTEEL A U 3 POLYVINYL CHLORIDE(PVC) A U 4 FIBERGLASSPIPE A U 91 NONE <br /> C.MATERIAL A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL CLAD W/FRP A U 8 100%METHANOL COMPATIBLE FRP <br /> A U 9 GALVANIZED STEEL A U 95 UNKNOWN A U 99 OTHER <br /> V. LEAK DETECTION SYSTEM CIRCLE P FOR PRIMARY,OR S FOR SECONDARY,A PRIMARY LEAK DETECTION SYSTEM MUST BE CIRCLED. <br /> P 8 1 VISUAL CHECK P 8 2 INVENTORY RECONCILIATION P 8 3 VADOSE WELLS P S 4 ELECTRONIC MONITOR P 8 5 GROUND WATER MONITORING WELLS <br /> P 8 6 PRECISION TESTING P 8 7 PRESSURE TESTING P S 91 NONE P 8 95 UNKNOWN P 8 99 OTHER <br /> VI. INFORMATION ON TANK PERMANENTLY CLOSED IN PLACE <br /> 1. ESTIMATED DATE LAST USED(MO/YR) 2. ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH <br /> SUBGALLONS <br /> STANCE REMAINING IN INERT MATERIAL? ❑YES [:] NO <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE,IS TRUE AND CORRECT, <br /> APPLICANTS NAME(PRINTED&SIGNATURE) DATE <br /> LOCAL AGENCY USE ONLY <br /> COUNTY# JURISDICTION# AGENCY# FACILITY ID# TANK ID# <br /> .��. CURRENT LOCAL AGENCY FACILITY 10 p APPROVED BY NAME PHONE#WITH AREA CODE <br /> PERMIT NUMBER PERMIT APPROVAL DATE PERMIT EXPIRATION DATE <br /> CHECK# PERMIT AMOUNT SURCHARGE AMT. FEE CODE RECEIPTS BY <br /> roam 816 29-m) THIS FORM MUST BE ACCOMPANIETi BY A FACILITY/SITE APPLICATION, FORM `A',UNLESS JRRENT FORM W HAS BEEN FILED <br /> DATA PROCESSING COPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.