Laserfiche WebLink
8. a. Describe the method that will be utilized to purge and/or inert the tank(s): <br /> AM <br /> b. Tank/Piping Hauler. <br /> Name /VA <br /> Address City Zip <br /> Phone No.( ) <br /> Hauler Registration # (if hauled as hazardous) <br /> C. Tank/Piping Disposal Site: <br /> Name AIA <br /> Address <br /> City Zip <br /> Phone No.( ) <br /> EPA ID# (if transported to a permitted TSD facility) <br /> 9• Describe, in detail, how the soil and//or water sample(s) beneath the tank and piping will be obtained: / C <br /> /10 So SG L'l� ohTtn lrl.Lr� �r .v �('OC ) /1 Olaiw S I SG.w_ Ot{,J <br /> G=Ikex __ t ('p ' k-If lorlaplol <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: <br /> Nd <br /> 11. Handling of excavated soil: <br /> a) What material will be used to line the tank pit and cover the stockpile? <br /> /V1q <br /> b) What will be the final destination of the excavated stockpile? <br /> MA <br /> c) Contaminated Soil Hazardous Waste Hauler. <br /> Name /�/{ Hauler Registration# <br /> Address <br /> CityZip <br /> Phone No. ( ) <br /> Page 5 <br />