Laserfiche WebLink
April 11, 1996 <br /> Page 6 <br /> appropriately for the concentrations of hydrocarbons and lead present, and hauled to the <br /> disposal site by a state-licensed hazardous waste transporter. Additional analyses may be <br /> performed as requested by the landfill to receive the stockpiled soil. <br /> Report Preparation <br /> A technical report documenting all field procedures and analytical results will be <br /> submitted within 4 weeks of completion of all field activities. <br /> Should you have any questions regarding the content of this work plan, please call. <br /> Sincerely, <br /> Pacific Environmental Group, Inc. <br /> Q��\S R GF ocsT <br /> JOSEPH J. 61!'.'71D <br /> Joseph Muzzio c <br /> Project Geologist EN" <br /> GEu_ <br /> CEG 1672 cauF°` �� <br /> Attachments: Table 1 - Soil Analytica ata- Petroleum Hydrocarbons <br /> Table 2 - Soil Analytical Data- Purgeable Halogenated Hydrocarbons <br /> Table 3 - Soil Analytical Data -Metals <br /> Figure 1 - Site Map <br /> Figure 2 - Utilities Map <br /> Figure 3 - Geologic Cross-Section A-A' <br /> Attachment A - San Joaquin County PHS/EHD Closure In Place <br /> permit application <br /> Attachment B - MPDS Quarterly Data Report <br /> Attachment C - Record of February 13, 1996 Telephone Conversation <br /> 3100971B\TANKWP.DOC <br />