My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTRAL
>
619
>
2300 - Underground Storage Tank Program
>
PR0524210
>
REMOVAL_2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:53 AM
Creation date
11/2/2018 4:26:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2005
RECORD_ID
PR0524210
PE
2381
FACILITY_ID
FA0016254
FACILITY_NAME
TRACY, CITY OF
STREET_NUMBER
619
STREET_NAME
CENTRAL
STREET_TYPE
AVE
City
TRACY
Zip
95376
APN
23515028
CURRENT_STATUS
02
SITE_LOCATION
619 CENTRAL AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CENTRAL\619\PR0524210\REMOVAL 2005.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL EXCAVATION CERTIFICATE <br /> Project Location <br /> Owner I <br /> t Phone No. <br /> Contractor Phone No y;V !�!'jQ <br /> License No:_� <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> — 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion,or <br /> _ 2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br /> Placed in the excavation in 12 lifts. <br /> _ A. Pea gravel--smooth, rounded material not more than one-half(1/2)inch in diameter <br /> — B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. Use of crushed rock will not be permitted for backfill if contact will be made between the <br /> backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of roject completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five f cubic arils gg <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform per <br /> 110Builamg Code <br /> Appendix Chapter 70. <br /> I <br /> I � <br /> ame mt <br /> i <br /> a <br /> t e rmt <br /> w <br /> tgnamre <br /> ` Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.