Laserfiche WebLink
12) Prepare a report summarizing the results of the above investigation. <br /> 5.2 UST Abandonment <br /> The following procedures will be performed for in place abandonment of the UST(the tank <br /> is currently empty and not in use): <br /> 1) The UST and piping will be triple rinsed by a certified contractor. The rinsate will <br /> be containerized in 55-gallon DOT drums. <br /> 2) The rinsate will be transported under manifest to an appropriate disposal facility. <br /> 3) Upon approval of the PHS/EHD, personnel of PCM will fill the UST with a concrete <br /> slurry. <br /> The opportunity to prepare this work plan is greatly appreciated. Please contact our office <br /> if you have any questions. <br /> Sincerely, <br /> GEOLOGICAL AUDIT SERVICES, INC. <br /> Bob Marty <br /> Project Manager <br /> p tim km 4 <br /> Pm6@uMPb965GW-05.9�1¢ <br />