My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHANNEL
>
1000
>
2300 - Underground Storage Tank Program
>
PR0231044
>
REMOVAL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:50 AM
Creation date
11/2/2018 4:27:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1995
RECORD_ID
PR0231044
PE
2381
FACILITY_ID
FA0003734
FACILITY_NAME
PRODUCTION CAR CARE PRODUCTS
STREET_NUMBER
1000
Direction
E
STREET_NAME
CHANNEL
STREET_TYPE
St
City
Stockton
Zip
95205
APN
151-160-60
CURRENT_STATUS
02
SITE_LOCATION
1000 E Channel St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHANNEL\1000\PR0231044\REMOVAL 1995.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAM" TIG PROTOCOL FOR ROUTINE TANK MOVALS . <br /> The following represents minimum sampling criterion required for closure compliance. Soil samples collected shall be <br /> representative of native soils beneath the tank's invert (tam's bottom) at a collection depth not to exceed 2 -4 feet If <br /> contamination is documented during closure,an Unauthorized Release Notification must be completed and submitted <br /> within five (5) working days pursuant to California Health &Safety Code,Section 25295. <br /> WATER NOT PRESENT IN TEE TANK PIT <br /> TANK TANK SIZE MINIMUM NUbBER LOCATION OF SOIL SAMPLES <br /> (Gallons) of SOIL SAMPLES <br /> < 1,000 1 per Tank FBI OR Pump End of Tank <br /> / 1,000 - 10,000 2 per Tank 1 at each End of Tank <br /> > 10,000 3 or More Ends and Middle OR generally <br /> per Tank spaced along the length of the Tank <br /> PIPING AND STOCKPILE <br /> PIPING SOIL SAMPLES 1 Sample every 20 lineal feet . �I <br /> TANK& PIPING STOCKPILE SAITLES 2 Samples every 50 cubic yards �I <br /> WATER IS PRESENT IN T.k`IK PIT <br /> TANK TANK SIZE MIND Ubf NLR BER I LOCATION of SOIL MINIMUM NUNME.R of II <br /> (Gallons) of SOIL SAMPLES SAMPLES WATER SAMPLES <br /> < 10,000 From wall next to tank <br /> Single Tank I 2 ends at soil/groundwater 1 <br /> interface <br /> > 10,000 OR From wall next to tank II <br /> Tank Cluster 4 ends at soill 1 <br /> groundwater interface <br /> SLAB PRESENT IN THE TANK PTT <br /> Soil samples shall be obtained beneath the slab within native soils. Penetration through the obstruction will be required in <br /> order to collect the samples. (Physical removal of the obstruction will allow sampling according to the above conditions.) <br /> TANK TANK S[ZE MINIMUbf NU vBER LOCATION of SOII SAMPLESII <br /> (Gallons) of SOIL SAMPLES <br /> < 1,000 3 per Tank Center and Ends OR Sides of Tank <br /> 1,000 - 10,000 5 per Tank Center and Ends OR Sides of Tank <br /> > 10,000 5 OR More per Tank Ends and Middle and generally spaced along <br /> the length of the Tank <br /> Ell 23 047 (Revised 7/10/92) Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.