My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1033
>
2300 - Underground Storage Tank Program
>
PR0232352
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2022 11:49:34 AM
Creation date
11/2/2018 4:30:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0232352
PE
2361
FACILITY_ID
FA0003829
FACILITY_NAME
VANCO TRUCK-AUTO PLAZA
STREET_NUMBER
1033
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323041
CURRENT_STATUS
01
SITE_LOCATION
1033 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHARTER\1033\PR0232352\BILLING 1988 - 2004.PDF
QuestysFileName
BILLING 1988 - 2004
QuestysRecordDate
9/23/2016 3:15:37 PM
QuestysRecordID
3198799
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOA(,'%,. i COUNTY ENVIRONMENTAL HEALTH 1, .ARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE I <br /> TYPE OF ACTION ❑ 1.NEW PLAN ❑ 2 CHANGE OF INFORMATION Mol, <br /> PLAN TYPE ❑ MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. Mm. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> FACILITY NAME 2-A <br /> Mas. <br /> FACILITY SITE ADDRESS 033 Lo , C 1CLy_j-ef Lsf A Ma. CITY SfoC. (.>�6M05, <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE J <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in M06 <br /> accordance with the equipment manufaclmers'instructions,or annwlly whichever is mon:frequent Such work most be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): M07. <br /> III. MONITORING LOCATIONS <br /> This monitoring plan most include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(Le.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> foray Hazardous Materials Business Plan map,etc.)which shows all required information,include it with this plaa. <br /> IV. TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) MIO. <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> 's\ SECONDARY CONTAINMENT IS: L .DRY [Ib.LIQUID FILLED ❑ a UNDER PRESSURE ❑ &UNDER VACUUM MI t <br /> PANEL MANUFACTURER: V E��E� 8P77�"C MIS MODEL#: `rSL 3570 MII, <br /> LEAK SENSOR MANUFACTURER: b-T M14. MODEL#(S): - 9 M15. <br /> ❑ I AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br /> PANEL MANUFACTURER: M16. MODEL#: M17. <br /> IN-TANK PROBE MANUFACTURER: Mts. MODEL#(S): Mls. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILYMIGHTLY ❑ c WEEKLY Mo. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): M21 <br /> PROGRAMMEDTESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c-OTHER(Specify): M2z Mn. <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 M24. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS Mu. <br /> RITY TESTTNG PER 23 CCR§2643.1 N o <br /> TEST FREQUENCY: a.ANNUALLY ❑ b.BIENNIALLY ❑ c,OTHER(Specify): Mea W7. <br /> • l' 6.VISUAL MONITORING DONE: a.DAILY ❑ b.WEEKLY(Regoha agmcyappmvr) <br /> ❑ <br /> 99.OTHER(Specify): Mea <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check a0 that apply) Ms0 <br /> RL 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(SyTRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: � a.DRY 1 [Ib.1JQU,ID FILLED ❑ e UNDER PRESSURE ❑ L UNDER VACUUM Mst. <br /> PANEL MANUFACTURER: C'eC�J e-`( F�JYI Msz MODEL# Ms3. <br /> LEAK SENSOR MANUFACTURER: __VP:eCjQC TTI MJ°' MODEL#(S): ZFISZ Mas. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? &YES [Ib.NO Mme' <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? 'Skaafl a.YES ❑ b.NO Mn <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.b. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK I E CTED �! _ <br /> MILD MANUFACTURER(s): P '.ICIC Ac�+ �,.�/N l Mss MODEL#(S): IV O S Mss. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(EL )THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLDMANUFACTURER: ���F.K �1n� Moo MODEL M; --Es [_ 3.S M41. <br /> PROGRAMME)LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. M42 <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? 6A-a.YES ❑ b.NO Mu. <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? �Q a.YES ❑ b.NO Ma. <br /> ❑ 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑j aa.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) M45. M46. <br /> ❑ 5.VISUAL MONITORING DONE: MM a.DAILY ❑ b.WEEKLY- ❑ c,MIN.MONTHLY&EACH TIME SYSTEMOPERATED" M47. <br /> 'RN.�Vpa '*Allowed fum<Xd ry ofsdwi m,agmry'amaffim fkI Nein, IyP 16C 925281 5(b)(3) <br /> ❑ 6.PPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(aX3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(Specify) Moa <br /> SJCEHD-d(07/03)-114 0723A3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.