My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1033
>
2300 - Underground Storage Tank Program
>
PR0232352
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2022 11:49:34 AM
Creation date
11/2/2018 4:30:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0232352
PE
2361
FACILITY_ID
FA0003829
FACILITY_NAME
VANCO TRUCK-AUTO PLAZA
STREET_NUMBER
1033
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323041
CURRENT_STATUS
01
SITE_LOCATION
1033 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHARTER\1033\PR0232352\BILLING 1988 - 2004.PDF
QuestysFileName
BILLING 1988 - 2004
QuestysRecordDate
9/23/2016 3:15:37 PM
QuestysRecordID
3198799
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 2 <br /> VI.DISPENSER MONMRING <br /> MONITORING OF AREAS BENEATH DISPENSER(S)IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) Wo, <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT(UDC) <br /> PANEL MANUFACTURER: fog)r MslMODEL q: 3,50. '%-69 W2. <br /> LEAK SENSOR MANUFACTURER: If —,L—r /eo'T M53' MODEL#(S): 3 5 a '2 r X Ma°' <br /> WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? a a.YES ❑ b.NO Mss' <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? [E a.YES ❑ b.NO M36, <br /> WILL FAILUREIDISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a.YES ❑ b.NO msn <br /> ❑ 2.MECHANICAL ASSEMBLY(e.g.,FLOAT AND CHAIN ASSEMBLY)IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br /> ASSEMBLY MANUFACTURER: Sk as P ✓4'f✓G Mss. MODEL d(S): Mss. <br /> ❑ 3.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(RN.. evP•oval) MW <br /> ❑ 4.NO DISPENSERS <br /> ❑ 99.OTHER(Specify) M61. <br /> VII. ENHANCED LEAK DETECTION <br /> ❑ 1.WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK M70. <br /> DETECTION(ELD)FOR THE UST(S)COVERED BY THIS PLAN,PER 23 CCR§2644.1,ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> VIII. TRAINING <br /> REFERENCE DOCUMENTS MAINTAINED AT FACII.rrY(Check all that apply) mso. <br /> 1. THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 2. 1 OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) <br /> 3. ,® THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as of 1/01/2005) <br /> 4. ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> 7. ❑ SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br /> 99. ❑ OTHER(Specify): Mal. <br /> Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to theirjob duties and can access those documents when needed. <br /> By January 1,2005 this facility will have a"Designated UST Operator"who has passed the operator exam administered by the International Code Council(ICC). By <br /> January 1,2005,and annually thereafter,the "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems. <br /> This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the leak detection equipment. <br /> ➢ The facility employee's role with regard to spills and overfills. <br /> ➢ Whom to contact for emergencies and leak detection alarms. <br /> For facility employees hired on or after January 1,2005,the initial training will be conducted within 30 days of the date of hire. <br /> IX. COMMENTS/ADDITIONAL INFORMATION <br /> Please use this section to include any additional UST system monitoring-related information(e.g.,additional information required by your local agency): Mss. <br /> X. PERSONNEL RESPONSIBILITIES <br /> AS OF 1/1/05, THE"DESIGNATED UST OPERATOR"IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT APPLICATION— <br /> FACB.FFY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br /> EQUIPMENT COVERED BY THIS PLAN,AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br /> UST SYSTEMS IN ACCORDANCE WITH 23 CCR§2715(b). <br /> XI. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> OWN R/OPERATOR SIGNATUREPRESENTING DATE: M91. <br /> ❑Owner mso. �7 Spi 7 i+.sr <br /> or <br /> O P RATOR NA print Pan OWNER/OPERATOR TITLE: Mss <br /> V, <br /> (Agemy Use Only) This plan has been reviewed and: ❑Approved ❑Approved With Conditions ❑Disapproved <br /> Local Agency Signature: Date: <br /> Comments/Special Conditions: <br /> SJCEHD-d(07/03)-3/4 07/23/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.