Laserfiche WebLink
v v <br /> STATE OF CALIFORNIA `•`L, �` <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM BRATE FORM FOR EACH TANK SYSTEM. <br /> CO ETE A SEPARATE <br /> MARK ONLY 1 NEW PERMIT 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ONSITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT a AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE a TANK REMOVED <br /> DEA OR FACILITY NAME WHERE TANK IS INSTALLED: <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.D.# O B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAY/YEAR) D. TANK CAPACITY IN GALLONS: 1,91 f)TU <br /> ILTANKCONTENTS IFA-1 IS MARKED,COMPLETE ITEM C. <br /> REGULAR <br /> A. ❑ 1 MOTOR VEHICLE FUEL ❑ 0 OIL B. C• ❑ 1iUNLEADED 3 DIESEL ❑ 8 AVIATION GAS <br /> a GASAHOL <br /> ❑ 2 PETROLEUM ❑ W EMPTY ❑ 1 PRODUCT ❑ 10UN EAIDED n`�-� 5 JET FUEL ��' ] METHANOL <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED U 99 OTHER (DESCRIBE IN ITEM O. SELO" <br /> D. IF(A.1)IS NOT MARKED. ENTER NAME OF SUBSTANCE STORED C.A.S.•: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B.AND C,AND ALL THAT APPLIES IN BOX D AND <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS t STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> B. TANK <br /> MATERIAL ❑ 5 CONCRETE ❑ 8 POLYVINYL CHLORIDE ❑ 7 ALUMINUM Q 8 100Y. METHANOL COMPATIBLE WIFRP <br /> (PrimaryTank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN W OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING 3 EPDXY LINING ❑ { PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING ❑ 6 UNLINED ❑ 95 UNKNOWN 99 OTHER <br /> UNING <br /> 18 LINING MATERIAL COMPATIBLE WITH 100% METHANOL? VES_ NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 6 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE O95 UNKNOWN 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> S. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 RARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U a FIBERGLASS PIPE <br /> CORROSION A V 5 ALUMINUM A V 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE WIFRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ NNT ONRORITIAL <br /> ING LJ 99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 <br /> vi CHECK F72 INVENTORY RECONCILIATION F73 VAD02E MONITORING ❑ A AUTOMATIC TANK GAUGING [_ 5 GROUND WATER MONITORING <br /> 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING F791 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MOIDAV/VR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES ❑ NO <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLANTSICNAME DATE <br /> IPwME.a 91GNA.RE1 <br /> LOCAL AGENCY USE ONLY THE STATE I.O.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY JURISDICTION# FACILITY# TANK# t2/ <br /> STATE I.D. a .� <br /> IERMITNUMBER I PERMIT APPROVED BV/DATE PERMIT EXPIRATION DATE t <br /> CORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> tr � ��� <br />