Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 9. SPILL/OVERFII,L CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer X Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box#100 Spill Box#87 Spill Box#91 Spill Box#Diesel <br /> Bucket Diameter: 13" 13" 13" 13" <br /> Bucket Depth: 15" 15" 15" 15" <br /> Wait time between applying <br /> pressure/vacuum/water and 0 0 0 0 <br /> starting test: <br /> Test Start Time: Ilam Ilam Ilam Ilam <br /> Initial Reading(Rj): 13 %" 13" 13" 13" <br /> Test End Time: 12pm l2pm 12pm 12pm <br /> Final Reading(RF): 13 %," 13" 13" 13" <br /> Test Duration: I Hr 11-ir 1 Hr 1 Hr <br /> Change in Reading(RF-R,): 0 0 0 0 <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: 11 X Pass ❑Fail X Pass ❑Fail X Pass ❑Fail X Pass ❑Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up or failed tests) <br /> Replace sill container seals <br /> J <br /> JUL 2 1 2017 <br /> -ENVIRONMENTAL HEALTH <br />