My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1033
>
2300 - Underground Storage Tank Program
>
PR0232352
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2022 2:10:29 PM
Creation date
11/2/2018 4:33:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0232352
PE
2361
FACILITY_ID
FA0003829
FACILITY_NAME
VANCO TRUCK-AUTO PLAZA
STREET_NUMBER
1033
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323041
CURRENT_STATUS
01
SITE_LOCATION
1033 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHARTER\1033\PR0232352\COMPLIANCE INFO 2016 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2016 - 2017
QuestysRecordDate
8/8/2018 11:06:32 PM
QuestysRecordID
3201703
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOA UIN Environmental Health Department <br /> COUNTY Linda Turkatte, REHS, Director <br /> Kasey Foley,REHS,Assistant Director <br /> PROGRAM COORDINATORS <br /> Robert McClellon, REHS <br /> Jeff Carruesco, REHS, RDI <br /> Rodney Estrada, REHS <br /> Willy Ng, REHS <br /> Muniappa Naidu, REHS <br /> August 29,2017 <br /> Megan Mitchell <br /> Elite IV Contractors, 2535 Wigman Dr. <br /> Stockton, CA 95205 <br /> Re: VANCO SR0078054-Amended <br /> 1033 W. Charter Way <br /> STOCKTON,CA 95206 <br /> The San Joaquin County Environmental. Health Department (EHD) has completed the review of the <br /> application for a permit to seal a Diversified Product Manufacturing penetration using Diversified Bulkhead <br /> Bonder on the diesel#2 submersible turbine pump (STP) sump on the underground storage tank(UST) <br /> system at the above noted address. This permit has been amended from its original version and <br /> supersedes the permit issued on the August 29, 2017. This permit was amended to include the repair of <br /> the outside sheeting of the 100 octane Veeder-Root annular 407 sensor which was conducted on June <br /> 27, 2017.The permit has been approved with the following conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control District for any <br /> applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval prior to <br /> commencing work. All new addenda supersede the previous ones. <br /> 3. Diversified Bulkhead Bonder may only be used on Diversified penetrations only after being <br /> properly cleaned with Diversified Bulkhead Cleaner, DBC II, per manufacturer specifications. <br /> Work on penetrations which are not manufactured by Diversified Product Manufacturing will <br /> require an amended scope of work. <br /> 4. Contact Cesar Ruvalcaba at(209) 953-6213 to arrange the following appointments (a 48-hour notice <br /> is required for inspection appointments). <br /> • A 24 hour hydrostatic secondary containment test, or its equivalent, on the diesel #2 STP <br /> sump. (This testing has been satisfied.) <br /> • Sensor functionality:Functionality of the 100 octane annular sensor,must be verified to ensure <br /> that monitoring has been restored to meet the requirements of Title 23 California Code of <br /> Regulations and the Health&Safety Code. <br /> Please be aware that the facility cannot operate the UST system prior to the EHD inspection <br /> and approval. <br /> 5. If concrete will be broken near the diesel#2 tank, a secondary containment test must be performed on <br /> the diesel#2 tank once concrete is poured in accordance with the manufacturer's guidelines. <br /> 6. Secondary containment testing for the impacted sump is required six months after installation or repair. <br /> Provide 48 hours notification to the EHD when this test is scheduled. <br /> 7. Any individual performing the work of a service technician must meet the following qualifications: <br />
The URL can be used to link to this page
Your browser does not support the video tag.