My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1033
>
2300 - Underground Storage Tank Program
>
PR0232352
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2022 2:10:29 PM
Creation date
11/2/2018 4:33:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0232352
PE
2361
FACILITY_ID
FA0003829
FACILITY_NAME
VANCO TRUCK-AUTO PLAZA
STREET_NUMBER
1033
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323041
CURRENT_STATUS
01
SITE_LOCATION
1033 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHARTER\1033\PR0232352\COMPLIANCE INFO 2016 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2016 - 2017
QuestysRecordDate
8/8/2018 11:06:32 PM
QuestysRecordID
3201703
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 U <br /> r <br /> % N L <br /> IST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as orlg€pais will be retained by EHD) <br /> 1. Site map enclosed? YES[] NO[] <br /> 2. Submit copies of ICC Service Teohniclan and/or Installer's certificate and all manufacturer tralrling certificates for each <br /> person Installing or testing any component that Is repaired or replaced. Ensure a copy of the"Site Health and Safety <br /> Plan"is avallable on the jobslte as required by Title S. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced end attach a diagram drawn <br /> to scale showing location of repalm and/or replacements, If repairing a component,describe how this will be done. (if <br /> d� cling piping, UDC's, or other USS'equipment, or performing tank top upgrado,use the /1ST installation Application <br /> pages 4.8 as necessary for s timely plan review): <br /> Boot replacement is undetermined at this time,testing has teen done prior to actual scope of work. <br /> We did list the sealant as that may all thats needed. Diesel#2 STP sump. <br /> The UDCs#8#9110#1Ill 2 &##14 will be tested as per violation. This will be overdue <br /> -S-month test only,. o repairs <br /> J) 4Df <br /> 4. List of equipment to be used(Attach manufacturer's spaclfication sheets showing third-party approval): <br /> Diversified Bulkhead Bonder <br /> - m �J-4- <br /> �I <br /> F-F1230038(revised 12.11.15) 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.