My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1033
>
2300 - Underground Storage Tank Program
>
PR0232352
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2022 2:10:29 PM
Creation date
11/2/2018 4:33:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0232352
PE
2361
FACILITY_ID
FA0003829
FACILITY_NAME
VANCO TRUCK-AUTO PLAZA
STREET_NUMBER
1033
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323041
CURRENT_STATUS
01
SITE_LOCATION
1033 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHARTER\1033\PR0232352\COMPLIANCE INFO 2016 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2016 - 2017
QuestysRecordDate
8/8/2018 11:06:32 PM
QuestysRecordID
3201703
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
02/01/2006 09:59 7077659908 RWL DESIGN PAGE 02 <br /> 7 � - /r..S � 1 E <br /> I- -1� <br /> James H. Ray <br /> CIVIL ENGINEER <br /> 2041. <br /> 2041.Hidden Valley Drive <br /> SautsRosa.CA 95404 [:NVIRONMENIAi_ HEAU+i <br /> 707480-8115 DEPARTMENT <br /> FEBRUARY 20,2006 <br /> S. Bravo Systems,,lnc, <br /> 2929 Vail Avenue <br /> Commerce,CA 90040 <br /> IRE: STATE REGISTERED PROFESSIONAL ENGINEER APPROVAL <br /> CCR Title 23 Divisiion,3,Chapter 16,Section 2636(8)(2) <br /> BRAVO DISPENSER CONVERSION FRAIL-MODEL CONV�B2000 <br /> This surface mounted dispenser anchorage frame adapts an existing installed under <br /> dispenser containment to a new dispenser. <br /> I have examined and reviewed the following items on the Bravo Dispenser Conversion <br /> Frame: <br /> 1. Bravo catalog sheet with specifications. <br /> 2. B2000 Conversion Frame Installation Instructions. <br /> Upon review of the materials and construction it is my opinion and conclusion that <br /> sound engineering design and engineering of the product provides an adapter that allows <br /> for the replacement of an existing dispenser leaving the existing under dispenser <br /> containment in place. <br /> James FT Ray <br /> Civil Engineer Np. 2d,918 <br /> CIYIt <br />
The URL can be used to link to this page
Your browser does not support the video tag.