My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1033
>
2300 - Underground Storage Tank Program
>
PR0232352
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2022 2:10:29 PM
Creation date
11/2/2018 4:33:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0232352
PE
2361
FACILITY_ID
FA0003829
FACILITY_NAME
VANCO TRUCK-AUTO PLAZA
STREET_NUMBER
1033
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323041
CURRENT_STATUS
01
SITE_LOCATION
1033 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHARTER\1033\PR0232352\COMPLIANCE INFO 2016 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2016 - 2017
QuestysRecordDate
8/8/2018 11:06:32 PM
QuestysRecordID
3201703
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Results of Testingloervicing <br />Software Version Installed: <br />C_omolete the following checklist: <br />X <br />In Section E below, describe flow and when these derfcienctes were or Will oe corrected. <br />Yes <br />ii <br />No* <br />Is the audible alarm operational? <br />X <br />Yes <br />a <br />No* <br />Is the visual alarm operational? <br />X <br />Yes <br />a <br />No* <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />X <br />Yes <br />F1 <br />No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br />not interfere with their <br />proper operation? <br />Yes <br />n <br />No* <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? <br />X <br />N/A <br />X <br />Yes <br />D <br />No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system <br />N/A <br />detects a leak, falls to operate, or is electrically disconnected? If yes: which sensors Initiate positive shut -down? <br />(Check all that apply) <br />o SumpfTrench Sensors; X Dispenser Containment Sensors. Did you confirm positive shut -down due <br />to leaks and sensor <br />failure/disconnection? X Yes; n No. <br />X <br />Yes <br />u <br />No* <br />For tank systems that utilize the monitoring system as the primary tank over lI warning device (i.e. no mechanical <br />overfill prevention <br />NIA <br />valve is installed), Is the overfill warning alarm visible and audible at the tank fill point(s) and operating properly? <br />If so, at what percent <br />of tank capacity does the alarm trigger? 95 % <br />u <br />Yes* <br />X <br />No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment <br />replaced and list the <br />manufacturer name and model for all replacement parts in Section E, below. <br />X <br />Yes* <br />No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) n <br />Product; n Water. If <br />es, describe causes in Section E. below. <br />X <br />0 <br />No* <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />Yes <br />X <br />Yes <br />u <br />No* <br />Is all monitoring equipment operational per manufacturer's specifications? <br />E. Comments: <br />Small amount of liquid in #15!16 UDC and in #14 SAT. <br />#13/14 — 208 sensor in STP and dispenser U <br />#15/16 — 208 sensor, in STP and dispenser <br />Diesel North —MAG, 409 annular. 208 Fill &STP <br />Monitoring System Certification <br />Page 2 of 4 <br />2 <br />12/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.