Laserfiche WebLink
S WRCB, January 2006 <br />Tl:is form is intended, for use by contractors perforniing annual testing of UST spill containment structures. Tlie completed form and <br />printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FACILITY INFORMATION <br />2. TF,STTNG CONTRACTOR INFORMATION <br />Company Name: ELITE IV CONTRACTORS <br />Technician Conducting Test: 2CC /,t l/1c1G�1 <br />Credentialsl: CSLB Contractor X ICC Service Tech. SWRCB Tank Tester Other (Specify) <br />License Number(s): j(ie t t t?? J,? i�etic), <br />3. �PTf ,T, RTICKF.T TF,STIN<Y INFORMATION <br />Test Method Used: X Hydrostatic Vacuum Other <br />Test Equipment Used:. <br />Date of Testing: 6/20/2018 <br />Facility Naives: <br />Vanco Truck — Auto Plaza <br />Facility <br />Address: <br />1033 W Charter Way Stockton Ca 95206 <br />Facility <br />Contact: <br />Mike Boparai <br />Phone: 209466-0833 <br />2 91 <br />3 <br />4 <br />2. TF,STTNG CONTRACTOR INFORMATION <br />Company Name: ELITE IV CONTRACTORS <br />Technician Conducting Test: 2CC /,t l/1c1G�1 <br />Credentialsl: CSLB Contractor X ICC Service Tech. SWRCB Tank Tester Other (Specify) <br />License Number(s): j(ie t t t?? J,? i�etic), <br />3. �PTf ,T, RTICKF.T TF,STIN<Y INFORMATION <br />Comments — <br />on repairs made prior to <br />and recommended <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the inforutation contained in this report is true, accurate, and in full eontpliur:ce with legal requirements. <br />Technician's Signature: <br />41/IC,�� Date: ` hZ6111V <br />t State laws and regulations do not currently require testing <br />to be performed by a qualified contractor. However, local requirements <br />maybe more stringent. <br />Test Method Used: X Hydrostatic Vacuum Other <br />Test Equipment Used:. <br />Equipment Resolution: <br />Identify Spill Bucket (By Tank <br />Number, Stored Product, etc.) <br />1 100 Octane <br />2 91 <br />3 <br />4 <br />Bucket Installation Type: <br />Direct Bury <br />X Contained in Sump <br />Direct Bury <br />X Contained in Sump <br />Direct Bury <br />Contained in Sump <br />Direct Bury <br />Contained in Sump <br />Bucket Diameter: <br />12" <br />12" <br />Bucket Depth: <br />141/2 <br />14" <br />Wait time between applying <br />vacuum/water and start of test: <br />l Omin <br />l Omin <br />Test Start Time (Ti): <br />9am <br />9am <br />Initial Reading (Ri): <br />13 %i" <br />127/8 <br />Test End Time (TF): <br />loam <br />IOam <br />Final Reading (RF): <br />13 %" <br />127/8 <br />Test Duration (TF — Tj): <br />1 hr <br />1 hr <br />Change in Reading (RF - Rj): <br />No <br />No <br />Pass/Fail Threshold or <br />Criteria: <br />Pass <br />Pass <br />Test Result: <br />X Pass ❑ Fail <br />X Pass ❑ Fail <br />Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments — <br />on repairs made prior to <br />and recommended <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the inforutation contained in this report is true, accurate, and in full eontpliur:ce with legal requirements. <br />Technician's Signature: <br />41/IC,�� Date: ` hZ6111V <br />t State laws and regulations do not currently require testing <br />to be performed by a qualified contractor. However, local requirements <br />maybe more stringent. <br />