Laserfiche WebLink
F. In -Tank Gauging/ SIR Equipment: <br />X <br />Check <br />this <br />box If <br />tank gauging is used only for inventory control. <br />r I <br />Check <br />this <br />No* <br />box if <br />no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />X <br />Yes <br />f_l <br />No <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />X <br />Yes <br />D <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />X <br />Yes <br />i I <br />No* <br />Was accuracy of system product level readings tested? <br />X <br />Yes <br />❑ <br />No* <br />Was accuracy of system water level readings tested? <br />X <br />Yes <br />❑ <br />No* <br />Were all probes reinstalled properly? <br />X <br />Yes <br />t_! <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />❑ <br />Yes <br />D <br />X <br />No* <br />N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br />fails a test? <br />* in the Section H, below, describe how and when these tleticiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): <br />Complete the following checklist: <br />(X) Check this box if LLDs are not installed. <br />X <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />Yes <br />D <br />ii <br />No* <br />N/A <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check ail <br />that apply) Simulated leak rate: X 3 g.p.h.; a 0.1 g.p.h ; ❑ 0.2 g,p.h. <br />X <br />Yes <br />I <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />X <br />Yes <br />❑ <br />No* <br />Was the testing apparatus properly calibrated? <br />X <br />Yes <br />❑ <br />❑ <br />No* <br />N/A <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />It i <br />Yes <br />a <br />X <br />No* <br />N/A <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />F1 <br />Yes <br />t_! <br />X <br />No* <br />N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br />disconnected? <br />❑ <br />Yes <br />D <br />X <br />No* <br />N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br />fails a test? <br />L! <br />Yes <br />a <br />X <br />No* <br />N/A <br />For electronic LLDs, have all accessible wiring connections been visually Inspected? <br />X <br />Yes <br />o <br />No* <br />Were all Items on the equipment manufacturer's maintenance checklist completed? <br />H. Comments: <br />Monitoring System Certification <br />Page 3 of 4 <br />12/07 <br />3 2/21 /07 <br />