My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1033
>
2300 - Underground Storage Tank Program
>
PR0232352
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2022 2:10:29 PM
Creation date
11/2/2018 4:33:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0232352
PE
2361
FACILITY_ID
FA0003829
FACILITY_NAME
VANCO TRUCK-AUTO PLAZA
STREET_NUMBER
1033
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323041
CURRENT_STATUS
01
SITE_LOCATION
1033 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHARTER\1033\PR0232352\COMPLIANCE INFO 2016 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2016 - 2017
QuestysRecordDate
8/8/2018 11:06:32 PM
QuestysRecordID
3201703
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1033 W. Charter Way, Stockton, CA 95206 Record ID PR0232352 <br /> GIX2016 PHOTO# 15 <br /> A ril 2016 D.O re ort with alarms missin <br /> FACILITYEMPLOYEE TRAINING 1 NA <br /> to ees have received the required on-the-job training within the ast year. x ' <br /> loyees hired within the past 30 days have received the required on-the-job twining. <br /> ee follow u actions <br /> y 4522- for follow up repairs 13/14 <br /> r/2/18/15 -Removed rainwater from #10, #8 &#]2 satellite UDC-Placed water in Ha mat drum <br /> er 1121/16-Removed rain water from Diesel fill and#112 
 UDC-Placed water in Ha_-mat drum — <br /> requested(5) 5 X 5 mats for fill to slop the rain intrusion-See work order 2126116-Installed <br /> ,Order 3128116-Removed rain water from #112 UDC cleared-LI Alarm-Placed water in Ha=mat drum <br /> Requiring Follow-UpActions: <br /> G <br /> Fatinah Zareef, REHS Page 15 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.