My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1033
>
2300 - Underground Storage Tank Program
>
PR0232352
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2022 2:10:29 PM
Creation date
11/2/2018 4:33:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0232352
PE
2361
FACILITY_ID
FA0003829
FACILITY_NAME
VANCO TRUCK-AUTO PLAZA
STREET_NUMBER
1033
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323041
CURRENT_STATUS
01
SITE_LOCATION
1033 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHARTER\1033\PR0232352\COMPLIANCE INFO 2016 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2016 - 2017
QuestysRecordDate
8/8/2018 11:06:32 PM
QuestysRecordID
3201703
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging/SIR Equipment- !X Check this box if tank gauging is used only for inventory control. <br /> Check this box it no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to pertonn leak detection monitoring. <br /> Com lete the following checklist: <br /> x Yes No' Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> X Yes r No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> X Yes is No' Was accuracy of system product level readings tested? <br /> X Yes I No' Was accuracy of system water level readings tested? <br /> ,X Yes 1! No' Were all probes reinstalled properly? <br /> X Yes I No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): Check this box if LLDs are not installed. <br /> Com lete the following checklist: <br /> X Yes No' For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check all <br /> N/A that apply) Simulated leak rate: X 3 g.p.h.; 0.1 g.p.h; 0.2 g.p.h. <br /> X Yes ❑ No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> X Yes u No' Was the testing apparatus properly calibrated? <br /> X Yes D No' For mechanical LLDs,does the LLD restrict product Now if it detects a leak? <br /> t+ N/A <br /> Yes I No' For electronic LLDs,does the turbine automatically shut off i1 the LLD detects a leak? <br /> X N/A <br /> Yes n No' For electronic LLDs, does the turbine automatically shut off it any portion of the monitoring system is disabled or <br /> fX N/A disconnected? <br /> Yes 11 No' For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> X N/A fails a test? <br /> Yes C No' For electronic LLDs,have all accessible wiring connections been visually Inspected? <br /> X N/A <br /> X Yes No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Monitoring System Certification Page 3 of 4 1 2J0 <br /> 3 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.