Laserfiche WebLink
'hyo CSB <br /> STATE OF CALIFORNIA `mss <br /> STATE WATER RESOURCES CONTROL BOARD iV <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B e� til �j <br /> ;y <br /> COMPLETE A SEPARATE FORM FOR EA ANK SYSTEM �����,� <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS—SPECIFY IF UNKNOWN <br /> A. OWNERS TANK I.D.i B. MANUFACTURED BY: N� <br /> C. DATE INSTALLED(MO/DAYNEAR) two D. TANK CAPACITY IN GALLONS: IC)O <br /> II.TANKC ENTS IFA-11SMARKED,COMPLETE ITEM C. <br /> A 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. / C. ❑ 1aUNLEADED REGULAR 3 DIESEL ❑ 6 AVIATION GAS <br /> Lr—,/ 4 GASAHOJETFUEL <br /> ❑ 2 PETROLEUM ❑ 80 EMPTY 1 PROOUCT ❑ 1bP LEAD D ❑ 5 JET FUEL ❑ 7 METHANOL <br /> ❑ 3 CHEMICALPRODUCT ❑ 95 UNKNOWN O 2 WASTE 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> 0. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.a: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B.AND C.AND ALLTHAT APPLIES IN BOXDANDE <br /> A. TYPE OF ❑ UBLE WALL [-] 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM GLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTEDTANK) ❑ 99 OTHER _ <br /> B. TANK 19'1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEELCLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM O 8 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) O 9 BRONZE ❑ W GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING OXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING ❑ 6 UNLINED 95 UNKNOWN ❑ 99 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP E:] 2 COATING ❑ 3 YL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE 95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 A U 99 OTHER <br /> C. MATERIAL AND A U I BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U S CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ 3 MONRORING ❑ OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑33,W95OZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUNDWATER MONITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAYNR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH <br /> SUBSTANCE REMAINING GALLONS YES INERTMATERIAL? ❑ NO❑ <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED431GNATUREI <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D.# 3 = 11 oli-liEip <br /> PERMIT NUMBER PERMIT APPROVED BYIDATE PERMIT EXPIRATION DATE <br /> FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> ///1 FOR09N7 <br />