My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
441
>
2300 - Underground Storage Tank Program
>
PR0231056
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2024 3:06:29 PM
Creation date
11/2/2018 4:48:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231056
PE
2381
FACILITY_ID
FA0003628
FACILITY_NAME
ARCO STATION #2168*
STREET_NUMBER
441
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707607
CURRENT_STATUS
02
SITE_LOCATION
441 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHARTER\441\PR0231056\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
3/9/2012 8:00:00 AM
QuestysRecordID
114394
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING & RESPONSE PLAN- IN <br /> ARCO PRODUCTS COMPANY FACILITY WITH <br /> SINGLE WALL TANKS AND SINGLE WALL LINES <br /> ARCO Facility ZI(c Address CH g2 — Qni <br /> 1 . DETECTION METHOD <br /> Tanks - Monthly Inventory Reconciliation and Annual Tank Integrity Testing in accordance <br /> with Sections 2646 and 2643(c)(2)(A) and (B), Article 4, Title 23, CCR. <br /> Lines - Automatic Pressure Line Leak Detectors and Annual Line Tightness Testing in <br /> accordance with Section 2643 (d)(1) and (3), Article 4, Title 23, CCR. <br /> 2 . MONITORING EQUIPMENT <br /> The Automatic line leak detectors will be maintained and inspected according to the <br /> manufacturer's instructions by an outside contractor once during each calendar year. <br /> 3 . MONITORING PROCEDURE - Inventory Reconciliation <br /> Inventory reconciliation will be performed in compliance with the details of Section 2646, <br /> Article 4, Title 23, CCR (copy attached and hereby incorporated). <br /> A The daily variation in inventory reconciliation shall be the difference between <br /> physically measured inventory in storage and the calculated inventory in storage. <br /> B. The physically measured inventory shall be determined at approximately the same time <br /> each day by taking liquid level measurement (stick reading) and converting it to <br /> gallons using a calibration chart. <br /> G The calculated inventory shall be determined at approximately the same time of day for <br /> each business day by adding the inputs and subtracting the withdrawals from the <br /> physically measured inventory determined the day before. <br /> D. These variations shall be summed for a period of one month. Monthly variations <br /> exceeding a variation of 1.0 percent of the monthly tank delivery plus 130 gallons <br /> must be investigated in accordance with instructions attached. <br /> See Exhibit A for reconciliation form. <br />
The URL can be used to link to this page
Your browser does not support the video tag.