My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
515
>
2300 - Underground Storage Tank Program
>
PR0506088
>
REMOVAL_1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:50 AM
Creation date
11/2/2018 4:49:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1996
RECORD_ID
PR0506088
PE
2381
FACILITY_ID
FA0007194
FACILITY_NAME
DON RODGERS
STREET_NUMBER
515
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707408
CURRENT_STATUS
02
SITE_LOCATION
515 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHARTER\515\PR0506088\REMOVAL 1996.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II <br /> j'. <br /> 8, a. Describe the method that will be utilized to purge and/or inert the tank(s): <br /> Tank(s) and line(s) will first be triple-rinsed and pumped out. Next, the <br /> appropriate amount of dry ice (15 lbs. per 1,000 gal. cap. diesel and 30 lbs. <br /> gasoline) will be added to the tank(s) and then monitored with an LEL meter. <br /> b. Tank Pipe Hauler: Jim 'FIlorPg Oil Co Inc <br /> Address: 351 N. Beckman Road / I1.O. Box 357City: Lodi, CA Zip: 95341-0357 <br /> Phone No. (916) 462-4581 <br /> hauler Registration N(If hauled as hazardous): 2667 <br /> C. Tank/Piping Disposal Site: <br /> Name: Sclnritzer Steel Products <br /> Address: _ 112111,111) Folsom ltonlevard__('try: Rancho Cordova zip: _95712_ <br /> Phone No. (916) 985-0810 <br /> 13PA IDN: (if transported to a penniued 1SD facility): <br /> 9. Describe, in detail, how the soil and/or water sample(s)beneath the tank and piping will be obtained: <br /> I <br /> After tank removal we will excavate 2 to 3 feet under the former tank location into <br /> native soil at the appropriate locations with the backhoe at the direction of the MID <br /> representative on site. Samples will be taken from the backhoe bucket. <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: <br /> Backfill of the excavation will be completed at the appropriate time during this project. <br /> if <br /> A determination of the most cost-effective method will be made and undertaken. Till ii <br /> material will be what is the most cost-effective for the final desired condition. <br /> 1t. Ilandling of excavated soil: ;I <br /> a) What material will be used to line the tank pit and cover die stockpile? <br /> 6 mil thick plastic sheeting <br /> h) What will be the final destination of the excavated stockpile? <br /> A determination will be made at the appropriate time. <br /> c) Contaminated Soil Hazardous Waste Hauler: <br /> Names: Dillard Truekimg hauler Registration N: 1745 <br /> Address: 3291 Byers Road / Rt. I fix 73 City: Byron, CA Zip: 94514 <br /> Phone No. (415) 634-6850 <br /> Pape 5 <br /> I I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.