My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
515
>
2300 - Underground Storage Tank Program
>
PR0506088
>
REMOVAL_1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:50 AM
Creation date
11/2/2018 4:49:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1996
RECORD_ID
PR0506088
PE
2381
FACILITY_ID
FA0007194
FACILITY_NAME
DON RODGERS
STREET_NUMBER
515
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707408
CURRENT_STATUS
02
SITE_LOCATION
515 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHARTER\515\PR0506088\REMOVAL 1996.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL EXCAVATION CERTIFICATE <br /> ProJectLocation 550 W. Charter Way,Stockton, CA 95206 <br /> Don Rodgers Phone No. (209)465-7515 <br /> Owner <br /> I <br /> Contractor JIM THORPE OIL INC. Phone No. (209)368-6175 License No.495699 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> I <br /> _ L Submission of Soil Engineer's Compaction Report within 30 days of project completion,or <br /> X 2. Submission o(verification, e.g., load ticket, within 30 days of project completion that one of the following materials <br /> was placed in the excavation in 12" lifts: <br /> X A. Pea gravel--smooth, rounded actingmaterial not more than one-half(1/2) inch in diameter . <br /> uarters <br /> inch <br /> sectional <br /> B Crushed mea.urem-no. (Use of crushed rock will not be permitted for bMaterial not more than ackfill if contact w011be made between <br /> the backfill material and tankstpipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereb certify that a Soil Engineer's Compaction Report will be submitted within 30 da of rojeci completion,or submission <br /> of verification that the select material described above will be placed at a minimum of five(4 cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building <br /> Cotte Appendix Chapter 70. <br /> • JIM THORPE OIL,INC. <br /> ame rnt) <br /> • CON'1'RAC <br /> Ile t <br /> • I <br /> ign ure <br /> " Shall be the responsible managing employee on the license or authorized agent. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.