My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1991
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
710
>
2300 - Underground Storage Tank Program
>
PR0540518
>
REMOVAL_1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:47 AM
Creation date
11/2/2018 4:50:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1991
RECORD_ID
PR0540518
PE
2381
FACILITY_ID
FA0002547
FACILITY_NAME
QUEEN OF SHEBA #2
STREET_NUMBER
710
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16717002
CURRENT_STATUS
02
SITE_LOCATION
710 E CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHARTER\710\PR0540518\REMOVAL 1991.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
latex gloves . Hard hats will be worn by all personnel on-site when <br /> l in proximity of drilling equipment. <br /> WORK ZONES AND SECURITY MEASURES: <br /> Access to the site will be restricted to authorize¢, personnel . A <br /> set of cones, placards, or wide yellow tape, surrounding the site <br /> will define the perimeter. The Project Manager will be responsible <br /> for site security. <br /> DECONTAMINATION MEASURES: <br /> Avoidance of contamination whenever possible is the best method for <br /> protection. Common sense dictates that on-site personnel avoid <br /> sitting, leaning, or placing equipment on possibly contaminated <br /> soil . <br /> All personA l will be advised to wash their hands, neck, and face <br /> with soap and water before taking a break or leaving the site . <br /> Respirators will be washed with soap and water following each day' s <br /> use . <br /> Sampling equipment used will be decontaminated by steam-cleaning . <br /> Sampling equipment will be decontaminated before each sample is <br /> taken . <br /> GENERAL SAFE WORK PRACTICES: <br /> I <br /> Personal safety and hygiene should be of utmost consideration while <br /> on-site . To prevent ingestion of contaminants no person shall be <br /> allowed to eat, drink, or smoke on the site . The Site Safety <br /> Officer will designate an appropriate nearby area. <br /> STANDARD OPERATING PROCEDURES : <br /> On-site personnel will be briefed each day in "tailgate" meetings <br /> as to the day' s goals and equipment to be used Anticipated <br /> contaminants and emergency procedures will The reviewed. <br /> Appropriate personal protective equipment will be put on and <br /> verified correct by SSO, including respirator fit. <br /> Sampling equipment will be steam-cleaned before being brought on- <br /> site . <br /> TRAINING REQUIREMENTS: <br /> The SSO will conduct a pre-site training session which will include <br /> all points of MSDS forms , contaminant properties, warning signs, <br /> health hazatd data, risks from exposure, and emergency first aid. <br /> All chemicals to be covered and the SSO will assure that everyone <br /> fully understands site hazards . <br />
The URL can be used to link to this page
Your browser does not support the video tag.