Laserfiche WebLink
14 Aeyrovl ©d '1'4700& 7 fo CAe.-vkAP_ LaH-C.- 4001r, Gf I,'("p'Cw.., 9 — ® — eI: <br /> Name or supplier.Owner or Dealer Address No.and Sleurns) Cary State Date of Test <br /> L 15. TANK TO TEST 16. CAPACITY From <br /> �k Station Chart <br /> �j By mos[accurate 4 QQ..e� Tank Manufacturer's Chan <br /> analls3 Nominal Capacity OI�O capacity chart available �IIdentityy by position Gallons Gallons Company Engineering Data <br /> ` Is there doubt as to True Capacity? El ❑ Chains supplied with pP1T0 T11P <br /> re..ru vw <br /> Brand and Grade Sae Section"DETERMINING TANK CAPACITY" ❑ ilsw <br /> I� Other <br /> III 17. FILL-UP FOR TEST Slick Readings Total Gallons <br /> to'A in. Gallons ea.Reading <br /> Stick Water Bottom O �S.9 30Q <br /> before Fill-up _ Inventory 3 J <br /> laar <br /> to%in. Gallons 11 <br /> 70 d l� <br /> Fill up.STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY <br /> Tank Diameter �" Product in full tank(up to fill pipe) <br /> Of -0 .73 <br /> ­` O0 . o <br /> C cop • 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK H/c!ro t..°�1 .1 ; 4ra,3 ® 6(p °� VAPOR RECOVERY SYSTEM <br /> xXm J <br /> i 1 e <br /> 00 > See manual sections applicable.Check below and record procedure in log(26). CO �. © /O p� Stage I <br /> oC L] Water In tank ❑ High water table in tank excavation ❑ Line(s)being tested with LVLLT CO Stage II <br /> 0 <br /> N 21. TEMPERATURE/VOLUME FACTOR (a)TO TEST THIS TANK <br /> 0 19. TANK MEASUREMENTS FOR Is Today warmer?a Colder <br />^7 TSTT ASSEMBLY / Y —°F Product in Tank_°F Fill-up Product on Truck_^F Expected Change( +or ) <br /> Bottom of tank to Grade*.................... 22. Thermal-Sensor reading after circulation /79 3-7 78 °F <br /> J Add 30"for 4"L ....... _" digits Nearest <br /> Add 24"for 3"L or air seal ....... 23. Digits per°F in range of expected change 3a 1 <br /> r, <br /> Q0n digits <br /> Total tubing to assemble Approximate ........ /1�" �1 a + <br /> l za. 3 oiS x , 000 41%6'311(0 — /o r V� gallpns <br /> 20. EXTENSION HOSE SETTING / , v total quantity in coefficient of expansion for volume change in this tank <br /> Tank top to grade*............._.................. Co " full tank(16 or 17) Involved product per°F / <br /> Extend hose on suction tube 6"or more \r 0 01 L <br /> below tank top ....................I................ IO /I r' 25. 1, r010 81! - - 3a = 10041,103 This is <br /> volume change per°F(24) Digits per"F in test Volume change per digit. lest <br /> 'If Fill pipe extends above grade,use top of fill. Range(23) Compute to 4 decimal places. factor(a) <br /> 26 30. HYDROSTATIC 31. 34. 38.NET VOLUME 39. <br /> VOLUME MEASUREMENTS RI TEMPERATURE COMPENSATION ACCUMULATED, <br /> LOG OF TEST PROCEDURES PRESSURE RECORD TO.W1 GIL. USE FACTOR(a) CHANGES CHANGE <br /> CONTROL EACH READING <br /> 27 28. 29. Standpipe Level 32. Product in Product 35. 36. 37. Tempemeirh <br /> ran At Lml mod <br /> in Inches Change Computation Adjustment Tdal End Deeecaon <br /> DATA Record details of setting up Release in Replaced I-) Thermal Higher♦ TO x (a)- Volume Minus <br /> and running test.(USB full No, Beginning Loyal to Sooner Lower- Expansion+ Expansion(+)or M Lee Lend compute <br /> length of line if needed.( of which to Aker Pradud Reading (c) Contraction- Contraction(-) thmre pet Now <br /> TIME fls,ding Restated Pending Reading Recovered l+) e33(V)—M37(T) (KIM aama) <br /> (24 N.) <br />