My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
1645
>
2300 - Underground Storage Tank Program
>
PR0231536
>
REMOVAL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:52 AM
Creation date
11/2/2018 4:55:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1999
RECORD_ID
PR0231536
PE
2381
FACILITY_ID
FA0003688
STREET_NUMBER
1645
STREET_NAME
CHEROKEE
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
11910013
CURRENT_STATUS
02
SITE_LOCATION
1645 CHEROKEE RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHEROKEE\1645\PR0231536\REMOVAL 1999.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CKFILL EXCAVATION CERTIFICATE <br /> Project Location 1645 Cherokee Rd. , Stockton CA 95205 <br /> Owner Central California Traction Co. Phone No. (209)466-6927 <br /> Contractor Jim Thorpe Oil , Inc . Phone No. (209)368-6175 License No. 495699 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> 3c 2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12" lifts: <br /> X A. Pea grave!--smooth, rounded material not more than one-half(I/2) inch in diameter <br /> B. Crushed rockāself-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfin if contact will be made between <br /> the backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of pproject completion, or submission of <br /> verification that the se!ect material described above will be placed at a minimum of five (5) cubic yards per 1CC0 gallon tank <br /> displacement and that the entire excavation will be back;lled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> * Jim Thor e Oil e <br /> ame nnt) <br /> Co;, ctor <br /> t rm <br /> * <br /> Signature <br /> * Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.