My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
200
>
2300 - Underground Storage Tank Program
>
PR0508038
>
REMOVAL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:51 AM
Creation date
11/2/2018 4:57:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1998
RECORD_ID
PR0508038
PE
2381
FACILITY_ID
FA0007904
FACILITY_NAME
HENRY HANSEN PROPERTY
STREET_NUMBER
200
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
200 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHEROKEE\200\PR0508038\REMOVAL 1998.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S. <br />9. <br />10. <br />a. Describe the method that will be utilized to purge and/or Inertthe tanks : <br />Dry ice will be added to the tanks at the rate of 20 per 1,000 gallon <br />capacity for diesel and 30 per 1,000 gallon capacity for gasoline.nrsi3>Stiiar <br />products. <br />b. Tank/Plping Hauler: <br />Name Jim Thorpe Oil, Inc. <br />Address P.O. Box 357 Cit, Lodi, CA ZIP 95241-0357 <br />Phone No.( 209 ) 368-6175 <br />Hauler Registration N (if hauled as hazardous) 2667 <br />C. Tank/Piping Disposal Site: <br />Schnitzer Steel Products <br />12000 Folsom Blvd. <br />Phone No./ 916 ) 985-4810 <br />EPA IDN (if transported to a permitted TSD facility) <br />city Rancho Cordova71P95742 <br />Describe, in detail, how the soil and/or water sample(s) beneath the tank and piping will be obtained: <br />If needed will be taken with a bailer. <br />Describe how the excavation will be backfilled with suitable material upon removal: <br />Backfill of the excavation(s) will be done at the appropriate time during this <br />project Backfill material will consist of the excavated.spoil if useable and <br />other clean compnetable material. <br />11. Handling of excavated soil: <br />a) What material will be used to line the tank pit and cover the stockpile? <br />6 mil plastic sheeting. <br />b) What will he the final destination of the excavated stockpile? <br />Depending upon the contaminate, levels of contamination and quantities of soil, <br />the spoil. will be hauled to either a class 1 or class 2 landfill or treated on site <br />c) Contaminated Soil Hazardous Waste Hauler: <br />Name .lim Thorpe Oil, Inc. <br />Address P.O. Box 357 <br />Phone No.( 209 ) 368-6175 <br />6H 23 046 (Revised 9/11/96) Page 5 <br />Hauler Registration N 2667 <br />Lodi, CA Zip 95241-0357 <br />
The URL can be used to link to this page
Your browser does not support the video tag.