Laserfiche WebLink
s. a. Describe the method that will be utilized to purge andlor Inert the tank(e} <br /> b. P /Pipin/g�Hau//ler: /y / <br /> Name �.G l i4/ <br /> Address //338 s alai,/a ✓ �pi city—e4Anp yip <br /> Phone No{ 42uq <br /> Hauler Registration f Of hauled as hazardous) N/119 <br /> e- Fap1d Ing,Diissppoosal site: <br /> Name /"U�(1,,A./GL✓n //�/1�� <br /> j Address 9999 4. 2alcityyAN533 <br /> i <br /> Phone N04 S209 ) q'9"9 9 e? <br /> j SPA Mf(1f transported to a permitted TSD facility) <br /> 9. is the sampling firm an Independent third party from the contractor? YES N NO]] <br /> 9a Describe,In detali,how the soil and/or water sample(s)beneath the and piping Will be obtained. /— <br /> i// G AO/�e� Gd u�i/. Ze`oiV4 x /3Vgivr, <br /> 10. <br /> Describe how the excavation will be backfilled with suitable material upon removat <br /> 4><G^r;4_/ <br /> 11. Handling of excavated soil <br /> a)What material will be used to Hue the tank plt and cover the stockpile? <br /> b)What Krill be the final destination of the excavated stockpile? <br /> .NDi✓ � lfDir 7iC n� /Y A�P� //>;/� .�jE ,�G - uS Pte' <br /> C)Contaminated Soil Hazardous Waste Hauler. <br /> Name W111 -ZGt✓Q��rm:nr�d �y �QeO <br /> Hauler RcaLstri:41c.:1'_ <br /> Address __--My 'Lia <br /> Phone No.C_ - ------) <br /> EH M 04C(Revised 08'a,99) Page s <br />