Laserfiche WebLink
NOTES: <br /> REMOVE(E)DPW VAPOR SPILL • <br /> CONTAINER&INSTALL CAPV x <br /> NA REFER TO THE MANUFACTURES'INSTALLATION MANUALS AND INSTRUCTIONS FOR THE APPLICABLE HUSKY 5885 nF O <br /> COMPONENTS AND SYSTEMS UTILIZED FOR THE EVR PHASEi AND SUMP(IF PRESENT)INSTALLATION. HUSKY 5885 DPW 23.033 VENT CAP • a <br /> 1 $ z <br /> ALL CURRENT CARRYING CIRCUITS SHALL COM PLY TO ALL APPLICABLE LOCAL,STATE AND FEDERAL •` of <br /> REGULATIONS,CODES AND THE NATIONAL ELECTRICAL CODE(NEC)FOR HAZARDOUS LOCATIONS. ALL � C <br /> NOTE' ELECTRICAL SYSTEMS AT FUELING FACILITIES SHALL COMPLY WITH ARTICLE 514 OF THE NEC. IF THE PIPINGEQUIPMENT <br /> QUEMENTVRphII UNION �• <br /> (E)PIPING AND CONNECTIONS ARE DPW SPILL FILL CONTAINER TURBINE SUMP IS BEING INSTALLED AT A FACILITY WITH ACTIVE ELECTRICAL SERVICE,AN APPROVED EQUIPMENT w <br /> GRAPHICAL IN NATURE,SHOWN FOR TO REMAIN LOCKOUT AND TAG OUT SHALL BE IN PLACE. AS INDICATED ON THE DRAWING,ALL ELECTRICAL rrr��T 4) <br /> REFERENCE ONLY, JUNCTION BOXES AND SEAL OFFS SHALL BE COMPETED AS HIGH AS POSSIBLE AND ABOVE THE HIGHEST I �� RELOCATE y i <br /> PENETRATION FITTING TO MINIMIZE CONDUIT LEAK PATHWAYS DURING TESTING. <br /> EXTEND VENT RISER //�w�/1 <br /> A UST SUMP IS CONSIDERED A CONFINED SPACE BY LOCAL,STATE AND FEDERAL CODES AND v+ <br /> REGULATION.ANY WORK PERFORMED IN A UST SUMP WILL REQUIRE PROCEDURAL AND SAFETY NOTES: <br /> REMOVE FRP CONNECTION TO PIPING TO EVftphll <br /> MEASURES FOR CONFINED SPACE ENTRY. I ALL EXPOSED ABOVE GRADE PIPING SHALL BE d <br /> VAPOR RETURN RISER.VERIFY EQUIPMENT GALVANIZED OR EPDXY COATED STEEL.THE I C <br /> (N)COUPLING <br /> SLOPE BACK TO REGULAR(87) THE PIPING AND COMPONENT ARRANGEMENT SHOWN 13 FOR REFERENCE ONLY AND IS NOT TRANSITION FITTING SPECIFIED FOR THIS <br /> REPRESENTATIVE OF THE EQUIPMENT CURRENTLY INSTALLED,THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION CONSISTS OF A STEEL OUTER <br /> TANK.CAP VR LINE RE-CONNECTING ANY OF THE EXISTING EQUIPMENT AND PIPING DISTURBED BY CONSTRUCTION HOUSING WITH BOTH STEEL ANO BUNA-N ^ ^ ^ C 3 <br /> ACTIVITIES. OD m LLJ COMPRESSION GASKETS, ,w <br /> TO VAPOR _ - `i I � 00 m � v/ � �G <br /> RETURN SYSTEM LJJ LLJ � VENT RISER LAYOUT IS SCHEMATIC&MAY 1 z C C �� <br /> Z Z O NOT REPRESENT FIELD CONDITIONS.IF IT IS W W v <br /> J J NOT POSSIBLE TO MANIFOLD THE REMAINING Z Z J `Q <br /> O O GASOLINE VENTS,CONTRACTOR WILL J J Ld Q <br /> (/) On LTJ CONFIGURE VENT RISER ASSEMBLY AS O O cn <br /> TANK LEVEL GAUGE WHEN Q ¢ c� INDIVIDUAL VENT RISERS&INSTALL A HUSKY (n (n W C <br /> PRESENT(TYP.) 0 0 5885 PRESSUREIVACUUM VENT CAP ON EACH Q Q O <br /> U, GASOLINE VENT RISER. <br /> REMOVE(E)TAPER FITTING v+ <br /> (E)TAPER FITTING FOR(E)VENT FOR FRP PIPE.REPLACE <br /> LINE TO REMAIN WITH CAP Mi <br /> TANK TOP <br /> (E)EXTRACTOR CROSS I�i BEFORE AFTER <br /> 1 FILUVAPOR RISER DETAIL 2 VENT RISER MANIFOLD DETAIL <br /> '. INIEIa MODEL DISPERSER <br /> NOTE: (E)ISD PRESSURE SENSOR TO BE NOTESWODELS1 <br /> VAPOR RETURN LINE SHOWN, PRODUCTPIPE INSTALLED IN DISPENSER LOCATED NO ALL <br /> AND SHOULD BE <br /> REQUIR VALVES SHOULD LINE UPDIRECTLYUNDER DISPENSER OUTLET. w, x woagE saos - acgnDE DEErvDEq DISPENSER - 9NIXE xDSE PEq sDE cvsoEu+e o <br /> PENETRATION FITTINGS SIMILAR,NO NO OFFSETS SHOULD BE REQUIRED. <br /> CLOSEST TO UST.WRAP RUBBER ADJUST SIDE-TO SIDE LOCATION OF DISPENSER AS NEEDED TO ALLOW CONNECTION. ADD OFFSET <br /> ADDITIONAL IBD CONNECTIONS. SHIM AROUND SENSOR BEFORE FITTINGS IF NECESSARY.IF PRODUCT ORDER IS REVERSED,CONTRACTOR MAY SWAP"A'&"B" NOTE-* <br /> INSERTING INTO CLAMP. o <br /> SIDES Of DSPENSER. CONTRACTOR IS RESPONSIBLE FOR CORRECT ORIENTATION OF THE STUB-UP'S TO THE DISPENSER.ANY <br /> DISPENSER FRAME - ADJUSTMENTS OF THE INTERNAL WORKINGS OF THE DISPENSER TO ACCOMMODATE INCORRECTLY INSTALLED w <br /> PIPING WILL BE AT CONTRACTORS OWN EXPENSE.STUB-UPS FROM HEADERS MUST MATCH LOCATION SHOWN <br /> (E)ISD FLOW METER TO BE ALL SUPPORT STRUCTURES MUST IN THIS PLAN TO MATCH DISPENSER'S INTERNAL CONFIGURATION, <br /> INSTALLED IN ALL DISPENSERS ANCHOR DIRECTLY INTO CONCRETE <br /> z <br /> BRAVO UDC IS)SHEAR VALVE (E)EXPLOSION PROOF DIMENSIONS SHOWN IN THIS VIEW ARE TO BE USED FOR SIZING UNDER DISPENSER CONTAINMENTAND TO DPSPENY.BOLT N <br /> {N)DISPENSER 40"x13-112" ELECTRICAL J-BOX CONCRETE CUTOUT CLEARANCES. TO(N)FRAMMES AADAPDAPTER <br /> (E)�"UNION 42 <br /> A'TUBING E)VAPOR RETURN i'NPT COUPLING FOR MID BOLTS 1.12"CONDUIT <br /> SHEAR VALVE 4" 18.5" 13.5" 4" VAPOR RECOVERY (TYP.OF 4) i m <br /> (E)y"VALVE, KNOCKOUTS , <br /> SWAY t SIDE 2 (TVP.OF B) "SHIELD"DIRECTS LIQUID <br /> GRADE ( GRADE ' FLOW INTO SUMP <br /> SURFACE • . � —= -- SURFACE � . -- � °a I <br /> , o <br /> FRAME ADAPTER(BRAVO) <br /> DILSEPR (91) gE.NlAR ^�' 'v'a' <br /> R:Mq. (91)) muq RWR. -0Y V W p (E)UDC TO REMAIN. CONTRACTOR TO <br /> (E)UNDER DISPENSER (E)UNDER DISPENSER /\ TO <br /> VERIFY DIMENSIONS BEFORE ORDERING <br /> CONTAINMENT SUMP INMENTSUP �= - , \ DISPENSER FRAME ADAPTER <br /> BRAVO 805106 (E)EXPLOSION PROOF BRAVO B05106 m a7 ,ELECTRICAL J-BOX p, <br /> ra <br /> (E)SUMP (E)SUMP s �` - (E)MOUNTING POINTS TO REMAIN <br /> PENETRATIONELECTRICAL PENETRATION PENETRATION n (E)VAPOR RISER • F� <br /> FITTING (E)VAPOR (E)RISER LOCATIONS <br /> ( PRODUCT, <br /> RETURNURNLINE LINE LINE 9F.o <br /> 2"FLEX CONNECTOR WI SIDE 1 y-8^ <br /> -- ROCK GUARD -� <br /> 2" FLEX CONNECTOR T-1i N o <br /> wt ROCK GUARD U <br /> W � <br /> � Z <br /> Z _ <br /> 3 UDC ISD DETAIL 4 UDC PIPING DETAIL 5 DISPENSER FOOTPRINT 6 FRAME ADAPTER DETAIL Y z <br /> Z 1„ _ 1,. U., 1/2" = 1'-0" W Q J <br /> Lai W <br /> LLJY <br /> O <br /> 4"^ OzwO <br /> I(E)TOPPERco Lj_ ULo <br /> # <br /> TO REMAIN v J �.i <br /> LLj <br /> t CD <br /> Quality FU013 J W <br /> owalIhy Fuer o o Q <br /> Q p U <br /> W ¢Q O Z Q <br /> O 5 I_ rn _j <br /> 4 (N)CONCRETE SLAB wl <br /> M4 REBAR @ 24"O.C. <br /> o <br /> BOTH WAYS 6" 6' (E)CONCRETE SLAB DRAWN BY: EDJ <br /> 400 0 0 0 MIN'I <br /> MIN. REVIEWED BY: RB <br /> DATE: 7/26/2011 <br /> 00 00 00 a JOB NO: 546824 <br /> D <br /> o .0 > <br /> zo DISPENSER @$ <br /> ISLAND <br /> gg w <br /> � DISPENSER �� o <br /> ISLAND o <br /> *, COMPACTED SUB-BASE Y:"0 STEEL DOWELS <br /> @ 12"O.C. <br /> SHEET <br /> EXISTING DISPENSER PROPOSED DISPENSER <br /> 7 ELEVATION A-A $ ELEVATION A-A 9 CONCRETE DETAIL 2 <br /> OF 2 SHEETS <br />