Laserfiche WebLink
3/4" RIGID CONDUIT <br />ONN HOMERUN TO MONITOR <br />CONSOLE JUNCTION BOX <br />PIPING SUMP— — <br />FOR DETAILS <br />SEE Og <br />PIPING SUMP 4 O 0 <br />FOR DETA <br />SEE/, LS <br />6 <br />EXTERNAL $EN OR <br />ADAPTOR (ESA <br />MODULE AT EA H <br />PIPING SUMP, TYP. <br />TANK LEVEL SENSOR <br />FOR DETAILS <br />SEE <br />TANK <br />TANK LEVEL SENSOR — <br />SEE L5 <br />3 <br />0 0 0 <br />O O <br />ANNULAR SPACE LJ <br />L <br />MONITOR <br />FOR DETAILS <br />SEE (@ <br />NOTE: CONCEPT APPLIES TO ALL TANK CONFIGURATIONS. <br />CONDUIT ROUTING AT TANKS <br />J/16' - 1' STANDARD TANK CONFIGURATION <br />ESA MODULE\\ <br />XPLOSION PROOF J -BOX <br />16 CUBIC INCH MIN.) <br />SUPPLIED W HD GRIP SEAL SENSOR) <br />3 4" RIGID CONDUIT <br />TO MONITOR CONSOLE <br />JUNCTION BOX <br />SEAL -OFF CONDUIT <br />PER NFPA SPECS <br />3 4" RIGID CONDUIT <br />T TANK LEVEL PROBE <br />AND ANNULAR SPACE <br />SENSOR PIPING SUMP <br />TANK <br />F- _ _ _ _ _ _ — — — _ — <br />2' SUMP SENSOR (18 <br />INSTALL PER MANUFAC RER'S <br />NOTE. REQUIREMENTS <br />OTHER EQUIPMENT IN SUMP REMOVED FOR CLARITY <br />PIPING SUMP SENSOR DETAIL <br />3/4" - 1' <br />u <br />DISPENSER <br />ISLAND <br />2 - 3 4' SPARES FOR <br />FUTUR CARDREADER <br />SYSTEM <br />1-LJ11V VILYY <br />3/4" PLUG - FLUSH WITH <br />FINISHED CONCRETE <br />O <br />CONCRETE DRIVE SLAB <br />11-3/4" COUPLING <br />o G ° <br />a a ° <br />° <br />a <br />G ° <br />° a ° ° ° <br />-- TO <br />END EDGE OF CARDREADER IPANELFUTURE <br />DISP. ISLAND <br />FUTURE CARDREADER <br />CONDUIT SPARES <br />5 <br />_,CONDUIT <br />1. <br />Exlat. Canopy <br />Column- <br />3/4" <br />olumn-3/4" NIPPLE <br />3/4" CAPPED <br />ELLBow <br />3/4" UNION <br />3/4'SEAL-OFF <br />3/4" CONDUIT <br />- <br />GRADE — <br />PULLWIRE <br />I.C. CANOPY COLUMN CONNECTION <br />3, = 1' <br />2 WIRE CABLE <br />EXPLOSION <br />F J- <br />(116PROPRO0CU IN MINIMUM) <br />TANK SLAB <br />ELECTRICAL GENERAL NOTES <br />EXPLOSION <br />16" DIA. MANHOLE <br />PROOF J -BOX <br />GRIP SEALS <br />(16. CUINMINIMUM) <br />(1 AT RISER - <br />-TANK SLAB <br />1 AT J -BOX) <br />CONSOLE <br />DETERMINED BY - <br />3/4" CONDUIT <br />Electrical Code and all other applicable Code <br />TANK <br />2" RISER - - <br />IJLTRAMAR .INC.) <br />SEAL OFF <br />RISER ADAPTOR & <br />FITTING, TYP. <br />CAP (CAP TO BE <br />MONITOR DETAIL. <br />MODIFIED TO SUIT <br />PROBE WIRES) <br />3 4" CONDUIT TO <br />ANNULAR SPACE <br />MONITOR <br />FEED WITH DEDICATED BREAKER <br />3/4" CONDUIT <br />determined In the field by contractor to minimize <br />70 SUMP <br />4" RISER - <br />TANK <br />TANK LEVEL <br />SENSOR .DETAIL <br />Conduit <br />Minimum 3/4" diameter, rigid 100% <br />2 WIRE CABLE <br />16" DIA. MANHOLE <br />GRIP SEALS <br />('' AT RISER 4 -BOX) <br />iii <br />EXPLOSION <br />F J- <br />(116PROPRO0CU IN MINIMUM) <br />TANK SLAB <br />ELECTRICAL GENERAL NOTES <br />All electrical work to be done in compliance with <br />TO CASHIER <br />D15iRIBUTION <br />(LOCATION TO BE <br />SEAL OFF <br />Chapter 5, Articles 500-503 and 514 of the national <br />CONSOLE <br />DETERMINED BY - <br />3/4" CONDUIT <br />Electrical Code and all other applicable Code <br />TANK <br />2" RISER - - <br />IJLTRAMAR .INC.) <br />INTERSTrfIpp,L, <br />I <br />I <br />I <br />requirements. <br />ANNULAR SPACE <br />MONITOR DETAIL. <br />Route of underground electrical conduits to. be <br />FEED WITH DEDICATED BREAKER <br />determined In the field by contractor to minimize <br />- - - <br />Installation costs. <br />Conduit <br />Minimum 3/4" diameter, rigid 100% <br />No pull boxes <br />MAIN <br />DISP- <br />ENSER <br />_ <br />Providepull wires in all unused conduits (spares, <br />PANEL <br />SUB- <br />EMERGENCY PUMP <br />SHUT OFF <br />etcb <br />PANEL <br />Label conduits and termination points <br />AMPERAGE <br />RELAY <br />TO PUMP <br />Seal-off's are required <br />VARIES <br />Gilborco <br />All Tank Monitor 3 conduits must terminate In a <br />RELAY <br />- <br />Monitor 3 <br />dedicated gutter box. ' <br />GILBARCO <br />(8 Tank) <br />The controller & printer willbe located inside _ <br />RELAY <br />TANK <br />manager's area. Actual location shall be as directed <br />TO CASHIERr <br />IC CONSOLE 4 <br />.a, <br />RELAY <br />MONITOR <br />3 <br />ro <br />P) by the Ultramar project engineer. <br />Spares <br />Spares are to be split. 1/2 will .terminate into a <br />dedicated "AC" gutter box. 1/2 will terminate into a <br />dedicated "DC' gutter box. <br />AC <br />- <br />Dispensers <br />All dispensers and console circuits to connect to a <br />OC <br />AC <br />single leg, "dedicated" breaker panel. <br />FUTURE <br />FUTURE <br />YARD <br />KNOCK <br />TANK <br />Provide 9 pair coaxial cable to all dispensers for <br />INTERCOM <br />CARD <br />READER <br />CARD SUB <br />READER PUMP <br />DISP- <br />ENSER <br />LIGHT, <br />SIGN, <br />OUT <br />SPARE <br />MONITORfutufe <br />3 <br />. <br />cardreoders &communications Price to "seat—off'. <br />P <br />SPARES <br />SPARES <br />ETC. <br />4 MIN. <br />} <br />Communications <br />All intercom conduits are t0 terminate in a dedicated <br />ITI" <br />. . . <br />SEAL -OFF, '. <br />gutter. box. Ultramar technicians will be installing <br />TYPICAL <br />new microphone, speakers, systems, etc.. . <br />Miscellaneous <br />Maintain electrical connections to all lights, signs, <br />Provide <br />phones, etc.. new conduits and connections <br />where necessary and per Ultramar consent. Additional <br />1 EACH TANK - <br />work of this type to be extra" unless shown on site <br />DISPENSER MONITOR <br />plan or electrical plan. <br />Demolition <br />All unused and/or abandoned electrical equipment to be <br />removed - conduits to be cut. <br />QUANTITY VARIES <br />SEE SITE AND BUILDING PLAN(S) FOR EQUIPMENT LOCATION <br />PETROLEUM AND YARD ELECTRICAL <br />EQUIPMENT SCHEMATIC (FOR REFERENCE) <br />—— <br />2 <br />/ NO SCALE <br />2 WIRE CABLE <br />16" DIA. MANHOLE <br />GRIP SEALS <br />('' AT RISER 4 -BOX) <br />iii <br />EXPLOSION <br />F J- <br />(116PROPRO0CU IN MINIMUM) <br />TANK SLAB <br />_ <br />SEAL OFF <br />2" SENSOR RISER CAP <br />FITTING, TYP. <br />3/4" CONDUIT <br />T6 TANK MONITOR <br />TANK <br />2" RISER - - <br />INTERSTrfIpp,L, <br />I <br />I <br />I <br />SENSOR (tA) <br />ANNULAR SPACE <br />MONITOR DETAIL. <br />3/4" - i' <br />