Laserfiche WebLink
STATE OFCAUFORNIASTATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM B o <br /> 1 <br /> ud� tiv <br /> I , <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> [MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT EDNE REM ❑ 2 INTERIM PERMIT ❑ ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLO EO ON ITE <br /> 4 AMENDED PERMIT 8 TEMPORARY TANK CLOSURE 8 TANK REMOVED OR FACILITY NAME WHERE TANK IS INSTALLED: / <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN ' <br /> A OWNER'S TANK I.D.4 B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAYNEAR) ..... / D. TANK CAPACITY IN GALLONS: <br /> IL TANK CONTENTS IF A-1 1S MARKED,COMPLETE(ITEM C. <br /> A 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C to REGULAR UNLEADED ❑ 3 KIETF <br /> ❑ 8 AVIATION GAS <br /> /❑ 2 PETROLEUM ❑ 80 EMPTY �1 PRODUCT lb PREMIUM UNLEADED O 4 L ❑ 7 METHANOL <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ lc MKX;RADE UNLEADED 5 L ❑ 8 M85 <br /> 2 LEADED 99ESCRIBE IN REM 0.BELONG <br /> D. IF(A1)IS NOT MAItED. ENTER NAME OF SUBSTANCE STORED C.A S.X <br /> III. TANK CONSTR TION MARK ONE ITEM ONLY IN BOXES A.B.AND C.AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF F-1I UBLE WALL F-13 SINGLE WALL WITH EXTERIOR LINER ❑ 5 INTERNAL BUDDER SYSTEM ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SI WALL ❑ 4 SINGLE WALL IN A VAULT ❑ 99 OTHER <br /> B. TANK ❑ iBARE EL F-12 STAINLESS STEEL E] 3 FIBERGLASS E] 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL F-15 CONCR ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ B 100% METHANOL COMPATIBLE W/FRP <br /> )Pfim9ry Tank) ❑ 9 BRONZE [-] 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> C.INTERIOR ❑ IRUBBER UNED F-12 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> LINING OR ❑ 5 GLASS UNING E] 8 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> COATING IS LINING MATERIAL COMPAT18 WITH 10D% METHANOL? YES_ NO— <br /> D.EXTERIOR ❑ 1 POLYETHYLENE WRAP 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> CORROSION <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ I NONE ❑95 UNKNOWN ❑ 99 OTHER <br /> E SPILL AND OVERFILL,lIC. SPILL CONTAINMENT INSTALLS EAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> DROP TUBE YES_ NO 3k STRIKER PLATE YES_ NO_ DISPENSER CONTAINMENT YES_ NO <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROU OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRES E A U 3 GRAVITY A U 4 FLEXIBLE PIPING A U 99 OTHER <br /> B. CONSTRUCTION A U I SINGLE WALL A U 2 DOUBLE LL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS EL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 8 CONCRETE A U T STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PRO TON A U 95 UNKNOWN A U 99 OTHER <br /> — <br /> D. YECXAMCN UNE LFAN 2 INE TMHTM:55 3 CgRIN6WS d EIECIRONIC UNE 5 A.O, TC PUIN 99 OTHER <br /> D. LEAK DETECTION ❑ aLTEcron ❑ TE9TNc ❑ WMTCRINO ❑ LE4N DET=R sNuroovm ❑ <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 RECONCILIATIONORY ❑ 3 VADOZE MONITORING 4 AUTOGAUGING C TANK ❑5 MONITORINGOUND TER ❑ 8 TE�NGTANK <br /> ❑ 7 MN NUOU INTERSTITIAL ❑ 8 SIR ❑ 9 TWEEKLY ANKGAUGINGAL 10 MONTHLY TANK ❑ 95 UNKNOWN ❑99 OTHER <br /> VI.TANK CLOSURE INFORMATION(PERMANENT CLOSURE IN-PLACE) <br /> 1.ESTI A TE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES ❑ NO <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL 7 <br /> THIS ORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE,IS TRUE AND CORRECT <br /> TANK OWNER'S NAME DATE <br /> (PRINTW A SIGNATURE) y— <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW 2et... I <br /> COUNTY! JURISDICTION A FACILITY A TANK k <br /> STATE I.D.# m = 771 -� 1106d <br /> PERMIT NUMBER PERMIT APPROVED BYADATE PERMIT EXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. FORM C MUST BE COMPLETED FOR INSTALLATIONS.THIS FORM <br /> SHOULD BE ACCOMPANIED BY A PLOT PLA" -ILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE U'--9GROUND STORAGE TANK RREG�U(,/UTMNS <br /> � <br /> FORM B (6-95) 1 ?/v 5- 74, QL 'f/'rJ <br />