Laserfiche WebLink
14. / >l cd <br /> Name or Supplier.Owner or DMlar Address No.and State l City Stats Date of Test <br /> g� 15. TANK TO TEST 16. CAPACITY From <br /> x rt By most accurate R Station Chan <br /> Nominal Capacity z-o UU/) <br /> y O Identity by position / capacity chart available:i; ❑l' I Tank Manufacturer's Chart <br /> Gallons u Company Engineering Data <br /> ElIs there doubt as to True Capacity? <br /> ❑ Charts supplied with PPIIO TIP <br /> I anted and Grade Sea Section"DETERMINING TANK CAPACITY" ❑ rmw <br /> Othnr <br /> 17. FILL-UP FOR TEST Stick Readings Total Gallons <br /> to V.in. Gallons ea.Reading <br /> Stick Water Bottom �/ <br /> Inventor <br /> before Fill-up S!/ _ y �3io <br /> all <br /> to' En. __ons <br /> Fill up.STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY <br /> Tank Diameter Product in full tank u to NM <br /> ;��o qs ( p pipe) _ /23/,!� <br /> �Oo <br /> a 0 m0 DO y 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK .lPL,S�.S�f iib° S8:Z VAPOR RECOVERY SYSTEM <br /> X <br /> 0 0 D See manual sections applicable.Check below and record procedure in log(26). Stage I <br /> i M N 22 ❑ Water In tank ❑ High water table in tank excavation ❑ Line(s)being tested with LVLLT Stage R <br /> 1yOOm <br /> 0 <br /> 0 21. TEMPERATUREIVOLUME FACTOR (a)TO TEST THIS TANK <br /> `l 19. TANK MEASUREMENTS FOR <br /> TSTT ASSEMEIs Today warmer? <br /> (] Colder?I]—.F Product in Tank_*F Fill-up Product on Truck_°F Expected Change( + or - <br /> ro Btanom of tank to Grade'.................... /�13 <br /> No 22. Thermal•Sanwr reading abler circulation //9�t0 ���s _'F <br /> Add 30"for s"L ................. x _' <br /> dgina NwreN <br /> Add 24"for 3"L or air seal ....... 23. Digits per'F in range of expected change <br /> Total tubing to assemble Approximate ........ / �� dtgds <br /> 20. EXTENSION HOSE SETTING 24. /0316 x Abna X001: gallons <br /> UL total quantity in coewmt of e:p hn on for volum s change in Mls tank `. <br /> Tank top to grade•.................................. �_ full tank(16 or 1?) Involved product par IF <br /> Extend hose on auction tube 6"or more o n p <br /> below tank top ..................................... _" 25. �O./94QSCf/ .3/el _ . O/w10' This is <br /> volume change per°F(24) Hs F in teat Volume chs <br /> It Fill pipe extends above grade,use top of fill. Rm PN, �e per al places, <br /> test <br /> Range(23) Compute to 4 decimal places. tactor(a) <br /> 26. 30. HYDROSTATIC 31. 34. 38.NET vatuMf 39. <br /> LOG Of TEST PROCEDURES PRESSURE VOLUME MEASUREMENTS ry) TEMPERATURE COMPENSATION CHANGES ACCUMULATED <br /> CONTROL RECORD TO.001 GAL. USE FACTOR(a) EACH READING CHANGE <br /> 27. 28. <br /> 29. Standpipe Levd 32. 35. 36. 37. Lmpwamms 11 High lnel record <br /> OaTE Record details of aetlin u in inches Piaduct in Product Chan p i TotsEMDeflection <br /> 0 p among Graduate Replaced(-I pa Com u(abon Adjustment Mint <br /> and running test.(Use full ss. Theme Higher+ (q . p)= Valume Minus <br /> Beginning tact to <br /> TTY[ length of line if needed.) 0 0 Shunt Lown— Expansion+ Expansion(+)or At las Level[ompute <br /> IH hr.) el welsh solace A. Product Rushes (c) Coniracoon- Contraction(-) Change Par Hour <br /> flmadlns Restated Newl Redins fleconrad l+) #33(V)-#37T) (NI'M mens) <br />