Laserfiche WebLink
.4 <br /> 14 T/7,,y o.l 1^0 'S/o/ s r'/.e�kro ( cc �N .(ooi� C.o /-0`7� -SI7 1 <br /> Name of Supplier,Owner or Dealer Address No.and Stien(s) c,' Sam Dare of Test <br /> g 15. TANK TO TEST 16. CAPACITY From <br /> x � By most accurate Station Chart <br /> CAS /r7DU6 Tank Manufacturer's Chan <br /> m Nominal Capacity capacity chart available /�3/n ❑ <br /> y Identity by potirion / Cellona —�Gallom <br /> A O > ❑ Company Engineering Data <br /> A f _ fl �;• Is there doubt as to True Capacity? ❑ ❑ Chans supplied with car petPo T11P rawl Brand end Grade See Section"DETERMINING TANK CAPACITY" Other f <br /> Y ❑ <br /> 17. FILL-UP FOR TEST Stick Readings Total Gallons <br /> to In.In. Gallom so.Reading <br /> Stick Water Soft= <br /> before Fill-tip I � In aentory <br /> to%In. Gallons <br /> F��fJzv� <br /> Fill up.STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY <br /> N 9 Tank Diameter Product in fug tank(up to gg pipe) .— /n �/�• <br /> Popo d <br /> w 0 0 0 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK h!Q� f(o,0,j� `S`/ �6e VAPOR RECOVERY SYSTEM <br /> A=XCA <br /> p 1 n See manual sections applicable.Check below and record procedure in log(26). Stage 1 <br /> I <br /> 00> <br /> O;N D ❑ Water in tank ❑ High water table In tank excavation ❑ Lkla(s)being tested with LVLLT ® Stage Y <br /> ODOOG <br /> M <br /> c 21. TEMPERATUREIVOLUME FACTOR (a)TO TEST THIS TANK <br /> 19. TANK MEASUREMENTS FOR Is Toch Warmer?f] Colder?f]_°F Product in Tank_°F Fill-UP Product on Truck—°F Expected Chane( + or I <br /> N TSTT ASSEMBLY Y v D <br /> a Bottom of lank to Grade • �/ �4 ° <br /> x / / L <br /> m ........._......... 22. ThermaFSenaor reading attar circulation <br /> Add 30"for 4"L ................. 36 _•• died. Nearml <br /> Add 24"for 3"L or air seal....... 1`924- •-,?- " 23. Digits per°F In range of expected change <br /> Total tubing to assemble Approximate ........ /7 2 •• dgds <br /> 20. EXTENSION HOSE SETTING X17 24. /D, /�. co <br /> X enm5:90/0 _ / .08R/g�� genome <br /> total Quantity In efficient of expansion far volume change In this tank <br /> Tank top to 9rede•.................................. " full tank(16 or 17) involved product per°F <br /> Extend hose on suction tube 6"or more I�•�/Y / �s e p �l �/ <br /> below tank top ..................................... .�_'� 25. 6 , (JO 91/2 l 1. ��O — 1 Q/9/t/(S This Is <br /> volume change per°F(24) Digits per°F in test Volume change per digit. lest <br /> 'If Fill pipe extends above grade,use top of till. Range(23) Compute to 4 decimal places. factor(a) <br /> 26• 30, HYDROSTATIC 31. 34. 38.Al VOLUME 39. <br /> LOG OF TEST PROCEDURES PRESSURE11 VOLUME MEASUREMENTS IYI TEMPERATURE COMPENSATION CHANGES ACCUMULATED <br /> CONTROL RECORD TO.001 GAL. USE FACTOR W EACH READING CHANGE <br /> 27, 28. 29. Standpipe level 32. 35. 36. 37. tape <br /> uetmem Total End trial recall <br /> Detraction <br /> Product in Product <br /> Oak Record details of settingu " Inches Change Computation i <br /> l Nndint Graduate Replaced(—I Thermal Higher+ Ex rise= Volume Minus <br /> and running test.(Use full No. Beginning Level le Samar Lower— Expertise t M lue level compute <br /> length of line it needed.) g g p Expansion(+)or span a er xum <br /> 11Y[ of which Belpre Alter Product Reading Ic) Contraction— Coniractian(—) N p <br /> IN N.1 Reading Rnt.ad fludinp Reading Recovered lel a331Y1—MO7(T) INfPA crxerial <br />