My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
4290
>
2300 - Underground Storage Tank Program
>
PR0503143
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2021 10:35:13 PM
Creation date
11/2/2018 5:07:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0503143
PE
2381
FACILITY_ID
FA0005698
FACILITY_NAME
FRED A SHAWVER TRUCKING CO
STREET_NUMBER
4290
STREET_NAME
CHEROKEE
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
4290 CHEROKEE RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHEROKEE\4290\PR0503143\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
7/2/2012 8:00:00 AM
QuestysRecordID
128841
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"y5UU9 p <br /> STATEOFCAUFORMA <br /> STATE WATER RESOURCES CONTROL BOARD °. <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br /> Cl fe COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION O 7 PERMANENTLY CLOSED ONSITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE B TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS— SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.D.# B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MOIDAY/Y'EAR) D. TANK CAPACITY IN GALLONS: <br /> II.TANK CONTENTS IFA-1 IS MARKED, MPLETEITEM C. ���I <br /> A. ❑ 1 MOTOR VEHICLE FUEL ❑ OIL g. C. <br /> ❑ 1a REGULUNLEAR 3 DIESEL ❑ 6 AVIATIONGAS <br /> ❑ 2 PETROLEUM ❑ EMPTY ❑ 1 PRODUCT 1b PREMIUM u 4 GASAHOL 7 METHANOL <br /> ❑ UNLEADED ❑ 5,JET FUEL ❑ <br /> ❑ 3 CHEMICALPRODUCT ❑ 95 KNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANC TORED C.A.S.# <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN OXES A.B,AND C.AND ALL THAT APPLIES IN BOX D AND <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SI GLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SEC GARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK ❑ 1 BARE STEEL ❑ 2STAINL S STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ a POL1'VINY CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (PrimaryTank) ❑ 9 BRONZE ❑ 10 GALVANIZE STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ED EPDXY LINING O 4 PHENOLIC LINING <br /> C.INTERIOR F-15 GLASS LINING ❑ 6 UNLINED ❑ 96 UNKNOWN <br /> LINING _] 9B OTHER <br /> IS LINING MATERIAL COMPATIBLE WITH /00%METHA G YES_ NO_ <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE 95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EOUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUN BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLES"PROTECTK)NA <br /> VINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETELW/COATING <br /> A U B 100% METHANOL COMPATIBLE WIFRP <br /> PROTECTION p U 9 GALVANIZED STEEL A U 10 CATHODI9fi UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTKIN ❑ i AUTOMATIC LINE LEAK DETECTOR ❑ ❑ 3 99 OTHER <br /> MONITORING [:] <br /> V.TANK LEAK DETECTION <br /> F961 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 UTOMATIC TANK GAUGING ❑ 5 GROUNDWATER MONITANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE E::] 95 NKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MOiDAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? YES ❑ NO❑ <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED a SIGN4TUREI <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW S/I a <br /> STATE I.D.# COUNTY# JURISDICTION# FACILITY# TANK# <br /> PERMIT NUMBER PERMIT APPROVED BY/OATE PERMIT EXPIRATION DATE <br /> FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> io - ao - 9a ,�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.