Laserfiche WebLink
09/28/2004 09:07 FAX 1 209 957 4163 PA9 FFORL A/P Z006 <br /> Sep 27 04 03: 41p F, nzen Hill 55e 181467 p_ 2 <br /> EMERGENUY RESPONSE PLAN]FORM <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location a[all times.The <br /> wnditions of the o ratio nformation monitoring an program t arc <br /> pe g permit.The permit holder must notify(She Iota)�eo,�evl withinn 300 days or any changes to tI1C <br /> monitoring procedures,unless required to obtain approval before making the change. <br /> Required by Sections 2632(d)and 2641(h)CCR <br /> Facility Name:_ 2,4-AL!��a2 <br /> Facility Address: <br /> AD <br /> I. If an unauthorized release occurs,how will the hazardous substance be cleaned up? <br /> Note: If released hazardous substances reach the environment, increase the (ire or <br /> explosion hazard, are not cleaned up from the secondary containment within 9 hours, <br /> or deteriorate the secondary containment, the Gocal a enC must be notified within 24 <br /> hours. <br /> 2. Describe the proposed methods and equipment to be used for removing and properly <br /> disposing of any hazardous substances. <br /> Asa-sT� �i1ti.t . <br /> 3. Describe the location and availability of the required cleanup equipment in item 2 above. <br /> 4. Describe the maintenance schedule for the cleanup equipment. <br /> E <br /> 5. List the name(s)and title(s) of the person(s)responsible for authorizing any work necessary <br /> under the response plan:'Aft X-&Cr: <1-i7eA—r <br />