Laserfiche WebLink
SWRCB,January 2002 <br /> Page 5 of <br /> _ & PIPING SUMP TESTING. <br /> ..Test-Method Developed By: U Sump Manufacturer U Industry Standard Professional Engineer <br /> U Other.((Specify) X" <br /> Test Method Used U Pressure U vacuum Ydrostatic <br /> U Other(5pecjN <br /> Test Equipment Uteri: !' e ( i ca-1 -Y Equipment Resolution: <br /> Sump#_ Sump# "L ump# Sump# <br /> Sump'Mate;iaL• �,1� toss Fiery frit <br /> Ffeighi from Temic Top to Top of <br /> Eli est Pi i :Penetration: l 3" 1"3 tl Z' <br /> Height-from Tank Top to Lowest <br /> Electrical Penetration! 2.1-('Ii l I 2.5'(Z�' <br /> Condition of sump prior to testing: n✓kiy <br /> Porbon of Sump Tested <br /> Doesturbineshutdown when <br /> Su -sensor detects li quid th M U No U NA <br /> SUMP 4 (bo U-Yes UNo UNA U Yes NOM U U o UNA <br /> ,produ aad�water <br /> Turbine shutdown response time N d�-G..a lea d N d 4-Gt- <br /> Is system programmed for fait safeYes U No U NA S U No U NA . U Yes U UNA U Y No U NA <br /> shutdown?� <br /> Was fail-safe verified to be U Yes o UNA U Yes o UNA U Yes U o UNA U Yes No UNA <br /> .. <br /> operational?* <br /> Wait time between Lying <br /> pressure/vacu d starting: .. <br /> test. lb tart[„ 4-es <br /> 'Test:Start Time; .' 40 1 7 ' `Po <br /> 4eitial.Read4fl3a. F,-'-Sri 1Fres CNcIP <br /> :,'Ve9-9nd Time: $ o O. $' !U <br /> Final Reading(Rsk e -S 4—6 cr . <br /> Tom Duratiom 3j/.iK w 4- S 30 r-r)�S <br /> Change in Reading(R,,R,)- P 0 e t���--�q �r t 0 .--o <br /> PesaTail Threshold or Criteria: S.3Ate+r.; , 00S <br /> ta i ",pry vti.�nraa 4, i3 a .a yxnuas uta. ... . , La. yY <br /> Was sensor removed for testing?- 1 es UNo UNA Yes UNo 'NA Yes U.No NA <br /> es U Ito U NA <br /> Was semorpmperly replaced andes U UNA 1(Yes UNo UNA. /UYes UNo U. : Yes U Na U <br /> vedriedfimctioaalaftertemin ? <br /> Colfintelils—(include informatign on repairs guide prior to testing,and recommended follow-up for failed teres) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(•Y is"NO"or"NA".the entire sump must be-tested (See SWRCB LG-1ti0) <br />