My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
610
>
2300 - Underground Storage Tank Program
>
PR0521866
>
COMPLIANCE INFO_2003 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 3:49:10 PM
Creation date
11/2/2018 5:10:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2007
RECORD_ID
PR0521866
PE
2371
FACILITY_ID
FA0014852
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
610
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
04745039
CURRENT_STATUS
01
SITE_LOCATION
610 S Cherokee Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\C\CHEROKEE\612\PR0521866\COMPLIANCE INFO 2003 - 2007 .PDF
QuestysFileName
COMPLIANCE INFO 2003 - 2007
QuestysRecordDate
10/28/2016 6:58:12 PM
QuestysRecordID
3244411
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,Januar'2002 Page of$ <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested - <br /> Test Method Developed By: ❑ Spill Bucket Manufacturer ❑Industry Standard ❑ Professional Engineer <br /> ❑Other(Specify) <br /> Test Metho -uw'Q: ❑Pressure ❑Vacuum ❑Hydros <br /> ❑ Other(Sped) <br /> Test Equipment Used: Equipment R ution: IIIIIIN <br /> Spill Boz# Spill Boz# Spill Box# Spill Boa# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and �\ <br /> starting test: <br /> Test Start Time: <br /> initial Reading(RI): <br /> Test End Time: <br /> Final Reading(RP): <br /> Test Duration: <br /> Change in Re g(Rr-Rj): <br /> Pass/Fail eshold or <br /> Crite <br /> Test Result: ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑ Fail ❑ Pass ❑Fail ` <br /> Comments— include information on repairs madeprior to testin , and recommended ollow-u or ailed tests <br />
The URL can be used to link to this page
Your browser does not support the video tag.