Laserfiche WebLink
IE COPY <br /> San Joaquin County <br /> oPgUiN <br /> DIRECTOR <br /> Environmental Health Dept <br /> Linda Turkatte,REHS <br /> 1868 East Hazelton Avenue <br /> PROGRAM COORDINATORS <br /> N: Stockton, California 95205-6232 <br /> Robert McClellon,REHS <br /> Jeff Carruesco, REHS,RDI <br /> '- Kasey Foley, REHS <br /> C,yCIFOQ�j�Q' Website: www.sjgov.org/ehd Adrienne Ellsaesser, REHS <br /> Phone: (209) 468-3420 Rodney Estrada,REHS <br /> Fax: (209) 464-0138 Willy Ng,REHS <br /> 1-25-16 <br /> Marty Weithman <br /> Service Station Systems, Inc. <br /> 680 Quinn Ave. <br /> San Jose, CA 95112 <br /> Re: Rancho San Miguel 610 S. Cherokee Ln. Lodi, CA 95240 SR0074031 <br /> The San Joaquin County Environmental Health Department (EHD) has completed the review of <br /> the application for a permit to conduct a "Cold Start" on the underground storage tank (UST) <br /> system at the above noted address. The permit has been approved with the following <br /> conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work. All new addenda supersede the previous ones. <br /> 3. Contact Aris Veloso at (209) 468-3453 to arrange the following inspection appointments <br /> (a 48-hour notice is required for inspection appointments). Please be aware that <br /> inspections for emergency work must be scheduled within five days of permit approval. <br /> a. Sensor functionality: Functionality of the monitoring system must be verified to <br /> ensure that monitoring has been restored to meet the requirements of Title 23 <br /> California Code of Regulations and the Health & Safety Code. A copy of the alarm <br /> history shall be printed prior to performing the "cold start" of the Veeder Root system <br /> and made available at the time of EHD inspection. <br /> b. Overfill prevention verification: Verify that external audio and visual alarm activates <br /> when tank is 90% full. <br /> Please be aware that the facility cannot operate the UST system or receive fuel <br /> prior to the EHD inspection and approval. <br /> 4. Any individual performing the work of a service technician must meet the following <br /> qualifications: <br /> a. Possess or be employed by a person who possesses one of several permissible <br /> valid, current contractor's licenses issued by the Contractors State License Board <br /> (may be issued to the installation company), or a Tank Tester's license issued to the <br /> individual by the State Water Board, and <br />