My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
610
>
2300 - Underground Storage Tank Program
>
PR0521866
>
COMPLIANCE INFO_2016 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 3:49:10 PM
Creation date
11/2/2018 5:12:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2017
RECORD_ID
PR0521866
PE
2371
FACILITY_ID
FA0014852
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
610
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
04745039
CURRENT_STATUS
01
SITE_LOCATION
610 S Cherokee Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\C\CHEROKEE\612\PR0521866\COMPLIANCE INFO 2016 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
11/1/2016 3:06:35 PM
QuestysRecordID
3247087
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Designated Underground Storage Tank(UST) Operator <br /> Monthly Visual Inspection Checklist <br /> Facility Name: Rancho San Miguel I Date:09/13/16 <br /> Facility Address:610 Cherokee Lane <br /> City: Lodi Zip Code:95340 <br /> Designated UST Operator Conducting the Inspection: Karen R Arnaiz <br /> International Code Council Certification#; 8032295-UCEx iration Date: 05/05/17 <br /> Signature: Phone:(209 518-4836 <br /> Y=Yes,N—No,NA-Not Applicable S <br /> Imo.. . ... ... MONITORING PANEL/ALARM HISTORY Y . N NA <br /> 7V Monitoring` s stem is owered ori end m ro r o eratin"mode. X <br /> 2 Monitoring system is not currently showing any alarms or warnings. X <br /> 3 Alarm history report/log for the previous month is available,and has been reviewed by the X <br /> Designated UST Operator. Attach a copy of the alarm history reporillog to thisform i'available. <br /> 4 Each alarm for the previous month has been responded to appropriately. X <br /> 5 Sensors located in tank-top containment sumps have not alarmed in the past month. X <br /> 5a List all tank-top sumps where alarms occurred in the past month <br /> Note:Sumps inhere on alarm lws occurred in rhe pwr month must be inspected unless a qualtrwd.service techricimr responded to,mxl <br /> properly addressed,the cause of the alarw.Attach documentation rertj)7ng approp nate service to this report. <br /> mom It'stanp inspection is reaired,record results in tienu 6,below. <br /> UST SYSTEM INSPECTION <br /> 6 Tank-top containment sumps are free of water,debris,and hazardous substance. Sensors are located properly. <br /> Note:Visual hj coon o amu Is an re tubed in sun where ah ahuvn Ira,omurred in the sl n onth or which there is no serviceimcord <br /> Y N Y N <br /> Sum Location:87 Fill X Sam Location:9! Turbine X <br /> Sum Location:87 Turbine X o <br /> Sump Location:91 Fill I X <br /> 7 Spill containment structures are flee of water,debt end hazardous substance. <br /> Y N NA Y N NA <br /> Tank 1 —Contents: 87 X <br /> Tank 2—Contents: 91 Ix I I I I I Ig <br /> 8 Under-dispenser containment areas are free of water,debris,and hazardous substance. Sensors are located properly. €€! <br /> Y N NA I Y I N I NA <br /> Dispenser 1/2 X I I I It <br /> Dispenser 3/4 X <br /> Dispenser 5/6 X <br /> PAPERWORK INSPECTION y Y N INA I DATE DONE € <br /> 9 Monitoring system certification has been completed within past 12 months. X 10/26/15 <br /> 10 Secondary containment tests have been completed within the required timeframe. X 08/26/16 <br /> 11 S ill containment structure(bucket)testing was completed within the past year. X 1026/15 <br /> 12 Tank tightness testing was completed within required timeframe. <br /> 13 Line tightness testing was completed within required timeframe. <br /> 14 Other required testing/maintenance was completed within required timeframe. List test/maintenance items below. <br /> Test/Maintenanee: <br /> Test/Maintenance: <br /> Test/Maintenance: <br /> mmiammigbiii mammal, <br /> FACILITY EMPLOYEE TRAINING Y~ N �NA <br /> 15 All facili em to ees have received the required on-the-job trainingwithin the past ear.05/04/16 X <br /> 16 All facili em to ees hired within the past 30 days have received the re uired on-the 'ob trainin . X ; <br /> Note: Any answer of"N"should be explained in the comment section on the following page,and will require <br /> follow-up action. k <br /> P <br /> i <br /> k <br /> s <br /> °s <br /> Page 1 of 2 November 2004 g� <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.