Laserfiche WebLink
0 SWRCB,January 2006 <br /> Spill Bucket Testing Report Form <br /> This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br /> printouts from tests(if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1.FACILITY INFORMATION <br /> Facility Name: OASIS PLAZA VALERO Date of Testing: 3-14-2012 <br /> Facility Address: 800 S CHEROKEE LN LODI CA <br /> Facility Contact: Phone: <br /> Date Local Agency Was Notified of Testing: <br /> Name of Local Agency Inspector(ifpresent during testing): ARIS <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: AFFORDA TEST 416 2nd Street Galt,CA 95632 (209)744-0112 Fax: (209)744-0116 <br /> Technician Conducting Test: ❑Lyle D.Nimmo ❑ Zane A.Nimmo ® David A.Winkler ❑ Felix G. Ramirez <br /> 5249115-UT 5263322-UT 5263373-UT 5273934-UT <br /> Credentials': ® ICC Service Tech. ® SWRCB Tank Tester <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used: ® Hydrostatic ❑Vacuum ❑ Other <br /> Test Equipment Used: h20 and tape measure Equipment Resolution: 1/16 <br /> Identify Spill Bucket(By Tank 1 87 2 91 3 DSL 4 <br /> ' Number, Stored Product, etc.) <br /> Bucket Installation Type: <br /> ®Direct Bury ®Direct Bury ®Direct Bury El Direct Bury <br /> f ❑ <br /> ❑ Contained in E] Contained inContained in Sump Contained in Sump Sump Sum <br /> Bucket Diameter: l I 11 11 <br /> Bucket Depth: 12.50 12.50 15.50 <br /> Wait time between applying <br /> vacuum/water and start of test: <br /> Test Start Time(TI): 900 900 900 <br /> Initial Reading(Rl): 12 11.50 14 <br /> Test End Time(TF): 1000 1000 1000 <br /> Final Reading(RF): 12 11.50 14 <br /> Test Duration(TF—Tl): 1HR IHR IHR <br /> Change in Reading(RF-RI): 0 0 0 <br /> Pass/Fail Threshold or 1/16 1/16 1/16 <br /> Criteria: <br /> Test Result: Z Pass ❑ Fail ® Pass ❑ Fair Z Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments— (include information on repairs made prior to testing and recommendedfollow-up for failed rests) <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> 1 hereby certify that all the information contained in this report is true,accurate,and in full compliance with legal requirements. <br /> Technician's Signature: �t "`aiDate 3-14-2012 <br /> State laws and regulations do not currently require testing to be performed by a qualified contractor.However,local requirements <br /> may be more stringent. <br />