Laserfiche WebLink
• i <br /> Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address. OASIS PLAZA VALERO#1800 S CHEROKEE LANE LODI CA <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . DSL. . . . . . . . . . . . . . . . . . <br /> . . <br /> . A . . . . . . . . . . . . . . . . . . . <br /> O y <br /> O <br /> O OK . . . . . . . . . . . . . . . . . . . . . . . . <br /> OA . . . . . . . . . . . . . . . <br /> . . . . . . . . O CAS .Opp.VENTS. <br /> STORE <br /> O <br /> % O <br /> r <br /> x <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . AiC <br /> . 87. . . . . . . .91. . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . <br /> .1 . ?. . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> Date map was drawn:2/28/11. <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br />