My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
808
>
2300 - Underground Storage Tank Program
>
PR0232250
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:32 AM
Creation date
11/2/2018 5:20:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0232250
PE
2381
FACILITY_ID
FA0010971
FACILITY_NAME
PROLUBE OIL
STREET_NUMBER
808
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742004
CURRENT_STATUS
02
SITE_LOCATION
808 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHEROKEE\808\PR0232250\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
3/17/2017 7:00:25 PM
QuestysRecordID
126808
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRITTEN MONITORING PROCEDURES <br />UNDERGROUND STORAGE TANK MONITORING PROGRAM <br />This monitoring program must be kept at the UST location at all times. The information on this monitoring <br />program are conditions of the operating permit The permit holder must notify San Joaquin County <br />Environmental Health Division, phone (209) 468-3420 within .30 days of any changes to the monitoring <br />procedures, unless required to obtain approval before maldng the change. <br />Required by Sections 2632(d) and 2641(h) CCR <br />Facility Name Lo A <br />Facility Address Y <br />A. Describe the freuency of performing the monitoring: <br />Tank V \ �; <br />0 <br />What methods and equipment, identified by name and model, will be used for <br />C. Describe the location(s) where the monitoring will be performed (facility plot plan <br />003 <br />List the name (s) and title(s) of the people responsible for performing the monitoring <br />and/or maintaining the equipment: <br />E. Reporting format for monitoring: T� <br />Tanlr ( 1u., -PI ki <br />F. Describe the preventive maintenance schedule for the monitoring equipment Note: <br />Maintenance must be in accordance with the manufacturers' maintenance schedule <br />but not less than every L' months: — <br />G. Describe the training necessary for the operation of UST system, including piping, <br />and the monitoring equipment: <br />
The URL can be used to link to this page
Your browser does not support the video tag.